My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:32:41 PM
Creation date
6/17/2020 1:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1986
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> d. Ensure that the drainage layer, <br /> has, as a minimum, the following <br /> characteristics: <br /> 1) Twelve inch thickness <br /> 2) Hydraulic conductivity of <br /> 1 x 10-2 cm/sec <br /> 3) Final slope of at least 2% <br /> (after settlement) . <br /> e. Provide details of the proposed <br /> drainage system, from the drainage <br /> layer to the water treatment <br /> system, and include provisions for <br /> inspection of the drainage system <br /> weekly and after major storms. <br /> f. Provide procedures which document <br /> that the owner or operator shall <br /> comply with prescribed sampling, <br /> testing and reporting when <br /> installing the cover. Testing of <br /> the compacted barrier layer should <br /> include a field test of the fill, <br /> to allow verification of density <br /> and permeability, prior to use of <br /> the fill in the impoundment. Test <br /> fill should consist of at least <br /> three six-inch lifts of compacted <br /> soil and a drainage layer. <br /> 16 a. Submit detailed plans and an <br /> engineering report describing the <br /> method of removing and treating <br /> the free liquid wastes. <br /> b. The expected year of closure is <br /> indicated as 1986; from the work <br /> schedule, it appears that the <br /> closure year should be 1987. <br /> 20 Closure schedule does not allow <br /> any time for "17(7). Construction <br /> of drainage controls" (It is <br /> assumed that this is a simultaneous <br /> action) <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.