My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:32:41 PM
Creation date
6/17/2020 1:27:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1986
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> Page Specific Comments <br /> Page Comment <br /> 10 Changes to the plans require approval <br /> by the Department; changes shall be <br /> reflected in plan amendments within 60 <br /> days after the change occurs. <br /> 12 Specify the level down to which <br /> equipment will be decontaminated and <br /> how completeness of decontamination <br /> will be determined, e.g. swipe tests, <br /> etc. , on individual pieces of equipment. <br /> 15 The following comments pertain to the <br /> cover design: <br /> a. Design clay barrier layer (cap) to <br /> have a 3 to 10 degree slope. <br /> b. The regulations require a compacted <br /> soil cover layer on landfill <br /> closures. The PITC proposal is an <br /> asphalt cover. Demonstrate that the <br /> proposed asphalt cover will afford <br /> protection to the clay cap, that is <br /> equivalent to a compacted soil cover <br /> layer. If this cannot be <br /> demonstrated, add the required <br /> compacted soil cover layer between <br /> the asphalt and the geotextile <br /> fabric. <br /> C. Install a flexible membrane <br /> barrier, at least 30 mils thick, <br /> directly over the clay barrier <br /> layer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.