Laserfiche WebLink
J . H . AslNFELDER & ASSOAATES <br /> GEOTECHNICAL CONSULTANTS • MATERIALS TESTING <br /> LAND & WATER RESOURCES <br /> ENVIRONMENTAL SERVICES DIVISION <br /> 9795 BUSINESS PARK DRIVE,SUITE D <br /> SACRAMENTO,CALIFORNIA 95827 <br /> (916)366-1701 <br /> August 4 , 1986 <br /> File : W-2009-1/14 : 394 <br /> The Marley Cooling Tower Company <br /> 5800 Foxridge Drive <br /> P.O . Box 2912 <br /> Mission, Kansas 66201 <br /> Attention: Mr . George C . Hopkins , <br /> Chief Production Engineer <br /> Dear George: <br /> Pursuant to our teleconversations of July 21 , 1986 and <br /> August 1 , 1986 please be advised of the following clarification <br /> on the lysimeter sampling activity on June 13 , 1986 . <br /> Please note that laboratory report shows a result for <br /> lysimeter L-26 which has been incorrectly labeled. This result <br /> is for lysimeter L-2B. Also, please be aware that lysimeters L- <br /> 246 , L-2A, and L-2C were not sampled due to these units needing <br /> repair. As discussed, we will assess the condition of each <br /> lysimeter during the August ground water sampling activities , <br /> currently scheduled for Monday and Tuesday August 4 and 5 , 1986 , <br /> respectively. We will furnish a lysimeter status report by mid <br /> August . <br /> Also , enclosed please find the results of the July ground <br /> water sampling. These results are included in four separate <br /> laboratory reports prepared by Canonie , three of which are dated <br /> July 23 , 1986 and one dated July 22 , 1986 . A copy of these <br /> results have been sent to your Stockton facility. In the future <br /> we would recommend obtaining at least one field blank and one <br /> duplicate sample for quality control/quality assurance (QC/QA) . <br /> We are arranging to include these QC/QA samples in the August <br /> activities . If you do not agree with these recommendations , <br /> please contact us immediately such that we may cancel the <br /> analytical testing. ¢ <br /> N� P55� <br />