• Anthony J.Landis -2- June 7, 1985 <br /> Marley Cooling Tower ' <br /> Other items that need to be addressed are: <br /> o Water samples should be taken from municipal wells surrounding the facility <br /> (California Water Service wells) . <br /> o Sludge samples must be taken from the bottom of the retention pond. <br /> o Data received by Marley, from their contractors, after a progress report <br /> has been sent to this office, should be forwarded expeditiously, rather <br /> than with the next progress report. <br /> o A workplan must be developed for further work to be done. All plans <br /> submitted refer only to preliminary assessments. Since all mitigation <br /> projects are multiple-phase projects, all different elements of the in- <br /> vestigation, including deliverables and schedules of tasks should be <br /> incorporated into a total workplan. This workplan should describe all <br /> tasks and include the schedules associated with these tasks. A more <br /> specific timeline needs to be developed, incorporating dates for interim <br /> deliverables (rather than just the final reports) . Results and technical <br /> reports should be submitted to this office before the final report. We <br /> need to review and approve of all work before proceeding to the next phase <br /> of the investigation. <br /> MR:st <br />