My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1982-1985
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1982-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 3:05:54 PM
Creation date
6/17/2020 1:48:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1982-1985
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Anthony J.Landis -2- June 7, 1985 <br /> Marley Cooling Tower ' <br /> Other items that need to be addressed are: <br /> o Water samples should be taken from municipal wells surrounding the facility <br /> (California Water Service wells) . <br /> o Sludge samples must be taken from the bottom of the retention pond. <br /> o Data received by Marley, from their contractors, after a progress report <br /> has been sent to this office, should be forwarded expeditiously, rather <br /> than with the next progress report. <br /> o A workplan must be developed for further work to be done. All plans <br /> submitted refer only to preliminary assessments. Since all mitigation <br /> projects are multiple-phase projects, all different elements of the in- <br /> vestigation, including deliverables and schedules of tasks should be <br /> incorporated into a total workplan. This workplan should describe all <br /> tasks and include the schedules associated with these tasks. A more <br /> specific timeline needs to be developed, incorporating dates for interim <br /> deliverables (rather than just the final reports) . Results and technical <br /> reports should be submitted to this office before the final report. We <br /> need to review and approve of all work before proceeding to the next phase <br /> of the investigation. <br /> MR:st <br />
The URL can be used to link to this page
Your browser does not support the video tag.