My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1982-1985
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1982-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 3:05:54 PM
Creation date
6/17/2020 1:48:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1982-1985
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA—HEALTH AND WELFARE AGENCY • GEORGE DEUKMUTAN, Governor <br /> DEPARTMENT OF HEALTH SERVICES <br /> TOXIC SUBSTANCES CONTROL DIVISION <br /> NORTHERN CALIFORNIA SECTION <br /> 4250 POWER INN ROAD - <br /> SACRAMENTO,CA 95826 May 22, 1985 <br /> (916)739-3145 <br /> Certified No. P707826216 ) <br /> Mr. George Hopkins MAY 2 IUAn <br /> Chief Production Engineer <br /> Marley Cooling Tower Company ENVIROMENTAL ticALTH <br /> P.O. Box 2912 FERMIT/SERVIOtS <br /> Mission, KS 66201 <br /> Dear Mr. Hopkins: <br /> SOIL AND GROUNDWATER ASSESSMENT PLANS, OFF-SITE SAMPLING PLAN AND STORMWATER <br /> POND SAMPLING <br /> We have reviewed the final version of the Soil and Groundwater Assessment <br /> Plans and the Off-Site Sampling Plans. Based on this review, we have deter- <br /> mined that the submittals are adequate to further define the extent of con- <br /> tamination at the Stockton facility. <br /> This office is in concurrence with the Regional Water Quality Control Board's <br /> comments regarding the proposal for slant drilling under the stormwater pond. <br /> Please submit soil and groundwater sampling and analysis results, as they <br /> become available, to this office and to Bob Fujii of the Regional Water Quality <br /> Control Board. A final report for this phase of investigation should be sub- <br /> mitted as soon as possible after completion of all assessment activities. <br /> It must be understood that all remedial investigations are multiphased projects. <br /> After the initial sampling and monitoring work is evaluated, there probably <br /> will be a need for further soil sampling and/or groundwater monitoring well <br /> installation. <br /> If there are any questions, please contact Marge Rouch at (916) 739-2791. <br /> Sincerely, <br /> Anthony J. Landis, P.E. , Chief <br /> Site Mitigation Unit <br /> MR:st <br /> r <br /> cc: Mr. Bob Fujii, RWQCB, Sacramento <br /> Mr. Leland Hall, San Joaquin County Health Dept. , Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.