Laserfiche WebLink
3 '"HE '�ARLEY COOLING TOWER COMPANY <br /> SITE ANALYSIS PLAN <br /> AND <br /> PRELIMIMARY CORRECTIVE ACTION PLAN <br /> SUMMARY <br /> Three phases are involved: <br /> I. Definitional <br /> II . Remedial <br /> III. Monitoring <br /> Each phase is described as follows: <br /> I. Definitional <br /> The Marley Cooling Tower Companv ("Marley" ) has developed extensive <br /> data which identified existing soil and groundwater contamination. Phase <br /> I of the action pian would entail the design and implementation of a <br /> rigorous sampling and testing program to accurately define the horizontal <br /> and vertical extent of that soil and groundwater contamination. <br /> II. Remedial <br /> Details of the remedial plan cannot be established until the information <br /> generated from the definitional phase is analyzed. However, the remedial <br /> plan would address both the elimination of potential contamination sources <br /> and the clean up of contaminated soil, groundwater and surfacewater. <br /> III. Monitoring <br /> An ongoing water quality monitoring program will be established. <br /> ACTION PLAN HIGHLIGHTS <br /> I. Definitional phase <br /> A. Surfacewater <br /> Develop matrix rating system to define contamination contributors. <br /> Design and operate precipitation run-off monitoring system. <br /> Mass balance analysis of run-off and contained contaminants to <br /> compare with actual volumes and concentrations at pond inlet. <br />