My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1982-1985
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1982-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 3:05:54 PM
Creation date
6/17/2020 1:48:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1982-1985
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 '"HE '�ARLEY COOLING TOWER COMPANY <br /> SITE ANALYSIS PLAN <br /> AND <br /> PRELIMIMARY CORRECTIVE ACTION PLAN <br /> SUMMARY <br /> Three phases are involved: <br /> I. Definitional <br /> II . Remedial <br /> III. Monitoring <br /> Each phase is described as follows: <br /> I. Definitional <br /> The Marley Cooling Tower Companv ("Marley" ) has developed extensive <br /> data which identified existing soil and groundwater contamination. Phase <br /> I of the action pian would entail the design and implementation of a <br /> rigorous sampling and testing program to accurately define the horizontal <br /> and vertical extent of that soil and groundwater contamination. <br /> II. Remedial <br /> Details of the remedial plan cannot be established until the information <br /> generated from the definitional phase is analyzed. However, the remedial <br /> plan would address both the elimination of potential contamination sources <br /> and the clean up of contaminated soil, groundwater and surfacewater. <br /> III. Monitoring <br /> An ongoing water quality monitoring program will be established. <br /> ACTION PLAN HIGHLIGHTS <br /> I. Definitional phase <br /> A. Surfacewater <br /> Develop matrix rating system to define contamination contributors. <br /> Design and operate precipitation run-off monitoring system. <br /> Mass balance analysis of run-off and contained contaminants to <br /> compare with actual volumes and concentrations at pond inlet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.