My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1982-1985
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1982-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 3:05:54 PM
Creation date
6/17/2020 1:48:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1982-1985
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> B. Groundwater <br /> Design and install complete goundwater monitoring program. <br /> Design and implement a detection survey as specified in 40 CFR <br /> 264. 98. <br /> Design and implement a program to determine background water <br /> quality. <br /> Establish piezometric data relative to shallow and regional aquifers. <br /> Establish data on vertical quality and head difference in areas <br /> of contamination. <br /> Establish horizontal contamination plume delineation through staged <br /> well placement radiating out from Well Number 6 to define <br /> contaminant migration both lateral and parallel to the regional <br /> flow system. <br /> Develop data on fluid quality within vadose zone attendent to retort <br /> through use of pressure/vacuum lysimeters. <br /> C. Sources of Contamination <br /> Define horizontal and vertical extent of all soil contamination <br /> through a comprehensive boring and sampling program. The boring <br /> program will include the soil under the stormwater pond. <br /> II - Remedial Phase <br /> A. Sources of Contamination <br /> Seal retort pit with reinforced concrete and lining material <br /> compatible with treating solution. <br /> Install early leak detection system under retort. <br /> Seal stormwater pond with double Hypalon liner. <br /> Install early leak detection system under pond. <br /> Alter treatment and storage process to significantly reduce potential <br /> for contamination of surface water run-off . <br /> B. Clean-up of Existing Contamination <br /> 1. Groundwater <br /> Design, install and operate an ongoing groundwater clean-up <br /> system which will draw contaminated water to the surface for <br /> treatment and subsequent discharge offsite or discharge back to <br /> the aquifer through an injection well system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.