My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 4:13:46 PM
Creation date
6/17/2020 3:14:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
American Moulding <br /> Page 2 of 2 <br /> Evaluation of Hydrocarbon Mobility dated July 1995) are not acceptable due to the <br /> current hydrological conditions. Submit a Work Plan to PHS/EHD for the additional <br /> investigation work required for this site by August 30, 1998. <br /> The Work Plan should include a survey of domestic, municipal, agricultural, industrial <br /> and any other wells within a 2,000 foot radius of this site. Contact the Dept. Of Water <br /> Resources, municipal water suppliers and nearby industries. Perforin a physical search of <br /> the area to identify any wells. Show locations of all wells, submit the construction details <br /> of the wells and evaluate the influence of pumping with respect to the migration of the <br /> contamination. <br /> In addition: <br /> i <br /> 1) Begin Quarterly Monitoring of groundwater at this site. On all future Quarterly <br /> Monitor Reports (QMRs) tabulate all TPHD sampling data(historical and to date). <br /> 2) Provide a rose diagram of all gradient determinations from the first gradient <br /> determination to present(upgrade this diagram every sampling event). <br /> 3) On all QMR maps, show previous Underground Storage Tank (UST) locations and all <br /> DMWs- <br /> 4) Purge water must be properly containerized and stored on site (or other PHS/EHD <br /> approved area). All containers must be appropriately labeled as to content, date of <br />{ accumulation, etc. Disposal of all purge water must be documented. <br /> . The soils should be sampled 5) Soil stockpiles remain at this site led and disposed of P <br /> properly. <br /> After installation of the additional MW(s) and PHS/EHD review of their sampling data, <br /> the need for remediation will be evaluated. Please contact Carol Oz, Senior REHS, at <br /> (209) 468-3440 if you have questions about this letter_ <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Carol Oz, Senior REHS Margaret Lagorio, RENS <br /> Site Mitigation Unit IV Supervisor <br /> cc: Mark List-CVRWQCB <br /> Dave Zuber-Dames and Moore <br />
The URL can be used to link to this page
Your browser does not support the video tag.