Laserfiche WebLink
V.�41+ VU tun 11:00 rAA JIZODIZZUU61 KIRKLAND ELLIS 10004 I� <br /> STXTE OF CALIFORNIA-CAL iFORNIA ENVIF9(' `NI'AL PFICA'FCrION AGFNGY !I I <br /> PCTE WILSON,Gover!ihar ` <br /> STATE WATER RESOURCES CTROL BOARD <br /> DIVISION OF CLEAN WATER PROGRAMS -••. <br /> 2014 T STREET,SUITE 130 _ ;Y <br /> P.O. BOX 944212 <br /> SACRAMENTO,CA 94244-2120 <br /> DEC 2 7 .1995 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND (FUND) <br /> TECHNICAL REVIEW GUIDANCE DOCUMENT NO. 4 <br /> Prg-Approving-CQrrective Actions Assisting n <br /> tS <br /> and IMRI-0ying_Caffirnia's USTQeanuproc <br /> This guidance document is intended to inform claimants that: 1).they.may_request pre-approval of <br /> corrective action cost estimates or bids, 2) the Fund's staff makes a concerted effort to help claimants <br /> with UST corrective action and 3) recent guidance from the State Water Resources Control`,Board <br /> (SWRCB) is expected to significantly after UST corrective action. <br /> The most important area of assistance to claimants is pre-approval of corrective action cost estimates <br /> and bids. Pre-approval is a way for claimants to have the Fund's staffAetermine the eligibility of <br /> corrective action costs in a specific contract or change order before the contract is signed and costs are <br /> incurred_ The Fund has found that pre-approval eliminates most of the:problems that have:kept <br /> claimants from being fully reimbursed for UST corrective action costs: Additionally the Fund has <br /> found that pre-approved corrective action costs are reimbursed more quickly than costs not pre- <br /> approved for reimbursement. This is because the Fund's staff is already familiar with the proposed <br /> work, and it is more a matter of confirming that the invoiced costs and actual scope of work are <br /> consistent with`the original proposal. <br /> It is strongly recommended that individuals and smaller husines.ses request and obtain pre-approval, <br /> before authorizing work to begin,for all contracts or change order's far corrective action. In some k <br /> cases, the Fund may require that a claimant obtain pre-approval of corrective action casts. <br /> rr <br /> Pre-approval of nre-paymentrr tive action cots:. The Fund reimburses oniv invoiced costs <br /> necessary for UST corrective action: those Invoices still must be submitted according to the Funds � <br /> Reimbursement Request Instructions before the claimant can receive reimbursement. <br /> Pre-approval not guarantee the amount to be reimbursgd: The scope of work originally pre- <br /> approved must be conducted_ If changes to the original scope of work;are directed by the lead. <br /> regulatory agency, reimbursement will be adjusted consistent with the pre-approved costs and scope of <br /> work.How to obt r <br /> re-A -oval 'm r id• Claimants should obtain a copy of the "Cost <br /> Pre-Approval Request" form from the Fund. The form must be signed by the claimant or a <br /> representative duly authorized on the Fund's "Authorized Representative Designation" form. I. <br /> Consultants, contractors or parties not duly authorized may not request,pre-approval on behalf of the <br /> claimant. In addition, the following documents or information must be'submitted for review: <br /> • A complete, signed copy of the proposed investigation work plan or Corrective Action Plan <br /> (CAP) as defined and required by the California Underground Storage Tank'Regulations. <br /> r- <br />