My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008135
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:47:10 PM
Creation date
6/18/2020 12:08:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008135
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6,3.3.4 Asphalt Surfacing <br /> Once remediation of the shop site is complete, the originally paved areas <br /> will be repaved with 3 inches of asphalt over and 8 inch compacted soil base. <br /> 6.3.4 Alt@rnative 7 - Excavation to 10,000 ppm with Landfarming <br /> This alternative is the same as alternative 3, except that soils will be <br /> removed down to a 10,000 ppm TPH diesel concentration following demolition of <br /> building. <br /> 6.3.5 Alternative 8 - Excavation to 10,000 ppm with Landfill Disposal of Soils <br /> Alternative #8 involves completing the same excavation and treatment as <br /> described in Alternative 7. After soils have been excavated, they will be <br /> disposed of at a Class I landfill. Clean backfill will be purchased to <br /> replace soils removed to the landfill. <br /> 6.3.5 Alterpative 2 - Excavation to 10,000 ppm (Accessible) with Landfarming <br /> This alternative is the same as alternative 5, except that soils will be <br /> removed down to a 10,000 ppm TPH diesel concentration following installation <br /> of sheet piling. <br /> i <br /> 6-14 <br /> BS/0204b <br />
The URL can be used to link to this page
Your browser does not support the video tag.