My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008138
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 1:04:49 PM
Creation date
6/18/2020 12:10:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008138
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The samples collected in 1987 were analyzed for polynuclear aromatic hydrocarbons (EPA <br /> Method 610) and TPH/D (EPA Method 8015), and the sample collected in January 1989, were analyzed <br /> for TPHID and volatile organic compounds (EPA Method 602) No detectable constituents were reported <br /> in either of these water sampling events <br /> In <br /> July 1990, Dames & Moore abandoned the JHKA wells and installed four new groundwater <br />' monitoring wells (DMW-1, DMW-2, DMW-3, and DMW-4, Figure 2 1) in accordance with the "Soil <br /> Remediation and Groundwater Monitoring Workplan" (Dames & Moore, 1990) The locations of the <br /> wells are shown in Figure 2 1 of this report The Workplan specified that groundwater monitoring wells <br />' be sampled on a quarterly basis for one year To date, four rounds of water sampling have occurred on <br /> August 1, 1990, December 5, 1990, March 13, 1991 and July 30, 1991, and two reports describing the <br /> methods, chain of custody documentation, groundwater samples and duplicate analytical results have been <br /> submitted to the RWQCB Results from these and all previous groundwater samples are discussed in <br /> Section 3 0 <br /> 1 <br /> 1 <br /> SAC36 046 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.