My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008193
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:38:40 PM
Creation date
6/18/2020 12:12:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008193
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ • <br /> 11 Prevent, to the extent possible, spills In the event that a spill occurs, <br /> contain liquid if possible <br /> 12 in Prevents lashof the contaminated materials <br /> splashing <br /> 13 Field crewmembers shall be familiar with the physical characteristics of <br /> the site operations including <br /> • Wind direction in relation to the contaminated area, <br /> • Accessibility to equipment and vehicles, <br /> 0 Areas of known or suspected contamination, <br /> • Site access, and <br /> • Nearest water sources <br /> 14 The number of personnel and equipment in the exclusion zone should be <br /> minimized but only to the extent consistent with workforce requirements <br /> of safe site operations <br /> 15 All wastes generated during Dames & Moore and/or subcontractor <br /> activities at the site will be disposed of as directed by the PM <br /> 16 All personal protective equipment will be used as specified and required <br /> 17 The buddy system will be used at all times when performing sampling for <br /> hazardous material when the first action level criteria has been exceeded <br /> or when working in remote areas <br /> 18 Personnel are to immediately notify the SSO or Site Manager if any <br />' indications of potential explosions or unusual conditions are observed <br /> 11 2 SAMPLING PRACTICES <br /> For all sampling activities, the following standard safety procedures shall be employed <br /> 1 All sampling equipment should be cleaned before proceeding to the site <br /> 2 At the sampling site, sampling equipment should be cleaned after each <br /> use <br /> 3 Work in"cleaner" areas should be conducted first where practical <br /> 4 All unauthorized personnel will remain outside exclusion zones at all <br /> times <br /> ' AMFOREST 2 1 7 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.