Laserfiche WebLink
SWRCB,January 2002 FINAL DRAFT AUG 1 '9 2020 Page 4 of 5 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry 9tSh&r1 ,1F LPA pmpoMEngineer <br /> ❑ Other(Specify) }r- !i P -11\1 <br /> Test Method Used: ❑ Pressure ❑ vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br /> Sump# Sump# Sump# Sump# <br /> UNLEADED DIESEL <br /> Sump Diameter: 42" 19" <br /> Sump Depth from Top of Tank: 27.25' 27.00" <br /> Sump Material FRP Coated Steel <br /> Height from Tank Top to Top of 12.25' 13.50" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Top of 15.25' 22.00" <br /> Lowest Electrical Penetration: <br /> Condition of sump prior to testing: Clean/Dry Clean/Dry <br /> Depth of Sump Tested' 14.50" 19.50" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ®Yes❑No DNA ❑Yes❑No®NA ❑Yes❑No DNA ❑Yes❑No DNA <br /> product and water)?' <br /> Turbine shutdown response time: 10 seconds Safe Suction <br /> Is system programmed for fail-safe <br /> shutdown? ®Yes❑No[INA [:]Yes❑No ®NA [:]Yes❑No [—INA ❑Yes❑No DNA <br /> Was fail-safe verified to be <br /> operational? ®Yes❑No DNA ❑Yes❑No®NA ❑Yes[:]No DNA ❑Yes❑No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 minutes 10 minutes <br /> test: <br /> Test Start Time: 9:58am 12:03pm <br /> Initial Reading(RI): 14.50" 19.50" <br /> Test End Time: 10:48am 12:35pm <br /> Final Reading(RF): 14.50" 19.50" <br /> Test Duration: 50 minutes 32 minutes <br /> Change in Reading(RF-R,): 0.00" -0.011, <br /> Pass/Fail Threshold or Criteria: 0.10gph 0.10gph <br /> Test Result ®Pass ❑Fail [DPass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? ®Yes[:]No DNA ®Yes❑No[:INA ❑Yes[:]No DNA ❑Yes❑No DNA <br /> Was sensor properly replaced and ®yes[]No DNA ®Yes❑No DNA ❑Yes❑No DNA ❑Ycs❑No DNA <br /> verified functional after testing? <br /> Comments—(Include information on repairs made prior to testing,and recommended follow-up for failed tests.) <br /> Test water is reused,controlled and disposed of by LLNL. <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO",then the entire sump should be tested. (See SWRCB LG-160) <br />