My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 12:54:47 PM
Creation date
6/18/2020 1:46:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 FINAL DRAFT AUG 1 '9 2020 Page 4 of 5 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry 9tSh&r1 ,1F LPA pmpoMEngineer <br /> ❑ Other(Specify) }r- !i P -11\1 <br /> Test Method Used: ❑ Pressure ❑ vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br /> Sump# Sump# Sump# Sump# <br /> UNLEADED DIESEL <br /> Sump Diameter: 42" 19" <br /> Sump Depth from Top of Tank: 27.25' 27.00" <br /> Sump Material FRP Coated Steel <br /> Height from Tank Top to Top of 12.25' 13.50" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Top of 15.25' 22.00" <br /> Lowest Electrical Penetration: <br /> Condition of sump prior to testing: Clean/Dry Clean/Dry <br /> Depth of Sump Tested' 14.50" 19.50" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ®Yes❑No DNA ❑Yes❑No®NA ❑Yes❑No DNA ❑Yes❑No DNA <br /> product and water)?' <br /> Turbine shutdown response time: 10 seconds Safe Suction <br /> Is system programmed for fail-safe <br /> shutdown? ®Yes❑No[INA [:]Yes❑No ®NA [:]Yes❑No [—INA ❑Yes❑No DNA <br /> Was fail-safe verified to be <br /> operational? ®Yes❑No DNA ❑Yes❑No®NA ❑Yes[:]No DNA ❑Yes❑No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 minutes 10 minutes <br /> test: <br /> Test Start Time: 9:58am 12:03pm <br /> Initial Reading(RI): 14.50" 19.50" <br /> Test End Time: 10:48am 12:35pm <br /> Final Reading(RF): 14.50" 19.50" <br /> Test Duration: 50 minutes 32 minutes <br /> Change in Reading(RF-R,): 0.00" -0.011, <br /> Pass/Fail Threshold or Criteria: 0.10gph 0.10gph <br /> Test Result ®Pass ❑Fail [DPass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? ®Yes[:]No DNA ®Yes❑No[:INA ❑Yes[:]No DNA ❑Yes❑No DNA <br /> Was sensor properly replaced and ®yes[]No DNA ®Yes❑No DNA ❑Yes❑No DNA ❑Ycs❑No DNA <br /> verified functional after testing? <br /> Comments—(Include information on repairs made prior to testing,and recommended follow-up for failed tests.) <br /> Test water is reused,controlled and disposed of by LLNL. <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO",then the entire sump should be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.