Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br />been addressed for Tracy Texaco as of December 16, 2020. <br />Open violations from September 08, 2020 inspection <br />CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br />the required information on the reports. <br />❑ This violation was corrected <br />❑ Supporting documents included <br />❑ This violation will be corrected by (date): <br />Describe actions taken or will be taken to correct violation: <br />Violation #209 - Failure to maintain the "Facility Employee Training Certificate" on-site (after October 1, <br />2018). <br />OBSERVATION: On the Facility Employee Training Certificate dated 8/26/2020, the "initial training dates" listed for <br />the employees were after the "date of assuming responsibility as a facility employee." The initial training dates are <br />not accurate and are the same as the date of training; several of the employees are listed as having received <br />training on previous training logs. <br />REGULATION GUIDANCE: All site employees must be trained prior to taking responsibility as a facility employee if <br />after October 1, 2018, or within 30 days of hire if prior to October 1, 2018. The Facility Employee Training <br />Certificate shall contain accurate information for all employees trained. <br />CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br />submit a copy of the updated form to the EHD. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 5 of 5 <br />