Laserfiche WebLink
rt<cY PEI/RP1200.12 <br />nmmds or the ATG readout. Pmpem a monitoring <br />fluid solution to add to the interstitial space. <br />4.3.6 Steel Tanks. Liquid -Filled (hydrostatic) <br />testi on -I ranks Acquire the sem. nuid As the <br />monitodng Ruid. Contact the mmuf.cumr far <br />instruction,. <br />4.3.7 Fiberglass Tanks. Determine tank sin <br />and diameter and apply the appropriate method. <br />4.9.B Test Equipment. Teat equipment shall <br />'P#P��1yy1s4#,i�O1gNAX <br />63 General. Und.gamnd product piping is available <br />with single and doubla walls. Double -walled piping pro- <br />vides contaimnem for leaks form primary containment <br />and must be leak -free Io prevent release of product Into <br />the mvimnment. <br />ude. <br />8.2 Purpose. This method is toed to tut the integrity <br />monitoring fluid; of piping interstitial apace(.). <br />stopwatch or other time,meatammtnt device 8.3 D.acdptlan of Teat. The Intmtitiel space Is <br />capable of measuring. i -second inumen rd; sled at the ends and is prewrlud with on Inert gas. <br />tape mature. The pm3au. is monitored for I hour. Many pressure drop <br />occurs. the secondary containment foils the test. <br />4.3.9 Teat Ismeac are. <br />1. Remove Any sensor that may he installed In the <br />unk interstitial space. <br />2. Determine and ra<ord the groundwater level. <br />3. Add tut liquid to the took Interstitial spa. <br />bringing the fluid level into the riser (.tend - <br />pipe) to the appropriate level based on the <br />-discovers written proccdum. <br />4. Document the starting level and start time of <br />the tut. <br />6. Start the time-mcasurcmcnt device. <br />8. Wait the appropriate dme according to the <br />ma braaturer. tett procedure. <br />7. Document the coding level And ending time of <br />the test. <br />8. Determine and retard the groundwater level. <br />9, Remove liquid added to the tank (ntanditial <br />space, and restore the liquid level in the unk <br />inuntit[al to normo[ operating condition. <br />So. Reinstall the sensor so that it is installed within <br />.-fact..". aptdficati.- <br />4.3.10 Pea/Fall Criteria. Compute the data to <br />the manuroeurar, pus/rAl criteria in Appendix A <br />I, determine if the tank has passed the teal. <br />5.4 Teat Condition., The primary pipe may cunoin <br />fuel, and dispensing activities may cenMuc during the <br />real without affecting teat results. <br />.6 Prepara <br />tion. if the Inteutltial lspace contains prod- <br />It6ct, ensure that Jha interslice h open to the .-ph- <br />and perform a precision wt on the primary piping before <br />mmh=IiAg . tut on the secondary eentainmenl piping. <br />Termination fitting. moat be sealed at all piping t.min.- <br />6.., and test finings must be accessible to perform the <br />tut. <br />Chack with the piping mmufaeurer ragsrdlne testing <br />FIGURE 5t. goods on piping transitions end through <br />Sump walls most be leak light when piping.eaandery <br />containment Integrity testing N pm/ormed. <br />�.Ita.6rg; •'i,:f•.Lr �t:r..'�t}1:+.:\��:1.w�t:., ''a'\ -aa� `:�s. <br />M) <br />6.2.1 Purpose. This method la used in tea the 8. If de split buoket Is found In havetract., Iota¢ <br />Integrity of single -welled spill buck- of the pd- pars or Separation of the bucket from IT. 911 <br />merry, containment of secondedly contained spill pipe, it k not considered to be liquid-tight.Thi. <br />bucker, visually indicates • cal failure. <br />8.2.2 Description of Test. The Spill bucker is <br />filled with w a.%The water level (.s me -red n Me <br />beginning and end At the wt. <br />6.2.3 Teat Equipment. 'fest equipment shall <br />include: <br />wmcq <br />• motudng Stick that la accurate to within I/16 <br />(0.063) Inch and of.uf r.isAI length; <br />• plumber's plug (appropriate elm, if umd); <br />stapsvul<h or other dme-massusemen, device <br />capable of.-Am,ing a 1 -second Incruntot. <br />0.2.4 Preparation. <br />L Cart should be taken when conducting the net <br />To <br />Ile I. or doting frc.ing weather condl- <br />Joe'. <br />2. Remove and property di.p.e of any liquid and <br />Jebru (loaves, SeOnsem end vuh) In Lhe spill <br />bucket. Cion the,pill bucket end examine it for <br />",Age, dttaU or hopmperly installed cumpo- <br />.cor,. Tf them Am loom components (e.g., (- <br />hand damps Arbutus), Ugh[. These item. before <br />mnducdng the integrity last. If them am Item. <br />that must be mpalmd or replaced (e.g., d.erio- <br />rated gtkeulsetis or dodo valves), notify the <br />npner/opcRNf. <br />3. Us.mino Ibe nil .p and sd.ptc, Turing for <br />Item, missing or damaged porta, And make <br />necessary opals. Compl.e any pairs beforehet. <br />putting wet. in the ,pill bucket Make soreLhet <br />the seal on des fill .p h P -.' <br />end in good <br />u <br />condition. no p mut fit Searcy and he leak - <br />tight on the dor. The watertevel during the cal <br />typically will be above fl- cap, So , Iekd <br />eng cap <br />will result in a failed wt. AS m altemmive eas <br />tight fill cap, ate n III. 1 plug In the fill riser <br />If approved by the authority having juri,dlmion <br />(AHI) And tank uwmer. <br />4. Tho spill -buck. drain valve, if prey ms, moat <br />be leak -tight m peAs the last. If it is nut look - <br />tight. it may be poasibio to Simply .move And <br />Permanently plug be drain valve. He..,.If <br />you choose to permanendy plug, ante. that Jo <br />local regulation. allow this madificodon. <br />NOTE: If the 011 cop le ml Included In the <br />spill bucket test andlor the cap is not light, It <br />could be the source of potential fuel -A--[- <br />malan from water inlmalon. <br />NOTE: Boom permament(y plugging. came <br />that local regulations .I low the drain valve to <br />be parm urouly plugged. <br />6,2.6 Test Procedure. <br />i, Ad <br />d water o the spill bucker to a level within <br />1.5 inch. of Ilse cop of the split back.. Allow <br />the water I-cule for 5 .1ma. before is initial <br />water level measure osm Is taken. <br />2. Place the maturing stick venally el the I. - <br />point in the spill bucket and extending Above the <br />wooer level to allow for An securnte msum- <br />m ra m be m ken. The location of the me.udng <br />nick must remain the sone for each water level <br />mcasurcmcnt. Do..... Jur initial water level <br />_e _nam es measured fmm the bottom of <br />the split bucket Alternative mctummem ..h- <br />ods may be .ed provided that m.wrement to <br />1/16 (0.063) inch con be male. <br />3. Take all precautions m prevent the water level <br />fiom being disturbed during me duration of the <br />test. <br />4. After I hour, document the coding we. T-1 <br />metummmL <br />6. Upon completion of the tut, remove and III, <br />pose or Ole water necmding to Section 6.7, and <br />dry the inside of the spill bucket befom returning <br />II to <br />service. <br />6.2.6 Pee./Fall Crlterle. If Ilse wale level has <br />dropped lest than Jig (0.175) Inch, the spill bucket <br />porus the Integrity M. <br />If the water level has dropped Ug (0.125) inch or <br />gmoor, tie spill bucket fails the integrity wt. <br />6.3 Spill Bucket Woolly Testing - Vacuum Test <br />Method. <br />6.31 Purpues. This method I. marl m test tire <br />integrity of single -wailed spill buckets or the p i- <br />®` ei� �l`'..,-�,.'��y`�vv. ?''`:�l[�:�c•A�.�.>'Y-.`�,i".h4=.�yhi�`h�.ti?Ntl;It�b���,'.1�;�12`�ait�zai2!i' <br />lemons Ud Pradkafar daTedng and VadRwllon of Spill, Overnll, Leak Deretlon and Secondary Ctrdnmenr Equipment at UST Fnlntas <br />ing requ[mnant. saved in this recommended practice em <br />• -yi r a �v,:�•." i <br />8''' <br />general statements and me very. Recommended pros- <br />mm levels and Last duratuna Are Addressed in Sed don 5.7.Fr':. <br />iti+ „Ty[. �sl' <br />Piping tut may diffac <br />ET!�:•,•ass;_ <br />:k I • Y ; t{:7jti <br />An-facmmrK psocedurea <br />' lTpp TINTr 's` <br />This test can be conducted in sections or as one con- <br />tinuous pipe depending on the imulladm. CAm should be <br />GA General. Spill backers and containment sumps for <br />taken to ensure the the entire secondary containment or <br />Lank systems em neither Intended nor dcs(ghed for the <br />,he piping system Is tested. <br />smmgc of peunleum products, but rather m contain small <br />6.8 Teat Equipment. Tut equipment shall include: <br />looks and spills fur short periods of time. This section <br />describes the pmcedums used to lest the integrity of aptll <br />• Inst gas am=(nitrogen, helium, etc.); <br />buckets And comAinmentsumps to cmmoc that lheydonot <br />• smoveath or other dme-mexsumm.t device capable <br />lank, <br />ofineasuringa I -second lnesamont; <br />6,2 Spilt Bucket Integrity Testing - Hydrostatic <br />• test tubing tacmbliu (Ibbing-conbiies provide <br />Test Method. <br />Lass m the beginning and end of the intersddal <br />- <br />spoce.); <br />WARNING: Do not use fuels such u gesso- <br />- preaa.gangewithal5ylgmnximamprraauremad- <br />ing with OS Increments. <br />6.7 Teat Praeedure. <br />L if necessary, Ininsull temuirolino (lest) hoofs at pip- <br />ing Terminations. <br />2, if necessary, connect The tubing Assemblies To the aec- <br />undoy containment unninetion fitting an each And of <br />it. section of piping m be tested. <br />3. Connect the inert gas sour. And pressure gauge. <br />4. Gradually pressurize the Interstitial space to 5 prig. <br />Close the valve And .lbw the pressure les subiliac. <br />Rcprtssurizc to the specified test prcasum if necessary. <br />6.Observe The pmssute for a period of 1 hour. <br />6. if the piping pressure site, I hour is lata than the last <br />p -sure, he& urtninslion ftllinge And lest assemblies <br />fns lacks. <br />7. Release the pressure on the system slowly. <br />a. Removes the lel equip. -I. <br />9. Restore The piping to its nmol operating condition. <br />6.6 P.ea/F.II Crlteti.. If no p-,.. change occurs <br />during the test period, the piping system passes The aec- <br />ondary containment integrity test. <br />If them Is any dfup In pr.eufa over the lest Proud, the <br />piping fails the secondary containment Integrity lea. <br />If chem is any increase in Prasmne ever the tut ped.d, <br />repast the test. <br />line, E66 or diesel As a test fluid because <br />they present a serious 11. and safety <br />hazard. Gu 111, vapor. ... flammable <br />and can explode If exposed to an Ignition <br />such es a spark or open flame. If <br />eotanN or opnteinmant arae 1s <br />net tight, <br />using fuel as the teat fluid will -us. Is <br />release Into the Boll of groundwater. <br />FIGURE a3. The hydrostatic method of determining <br />spill bucket Integri0' uses water to dot"[ leaks. The <br />measuring stick must be placed In the same location <br />at the beginning and end of the test period to Ancona <br />amumte watA,1..l readings. <br />pel.org <br />pakomnasded <br />1,— 1. the Tndig and Vellk•d.A of SpM, overfill UA Deaden and Secondary Conja oast Equipment al UST Wall. <br />mmy Imtainmea, of wcmrd.dly con .load split WARNING: Us. only a. •Ir -operated new <br />bucket,. um vaunts o........ pump powered by <br />8,3.2 Descriptloo of Test. Using a specially <br />equipped Irl cover, a partial v-.. is applied to <br />thespill breket.Thovs.um level Is irmoad for <br />. 1 -robed. period. <br />6.3.3 Teat Equipment. Tasr equipment Asti <br />Include: <br />• Vacuum tut apparatus (Th. len upper . may <br />be n -][able from the spill bucket mmndoc/urer. <br />les incudes nn air p -.,.m mgtdnrr, a -Aum <br />source, A vacuum gang. will, A minimum 0-50 <br />inch waecolumn range td -ural vnlve.The <br />comml valve Isused to adjust the ve-on level.); <br />• Test cover (The cover is equipped with A len <br />fltdng.); <br />Plumber's plus (Appropriate dm, if .,d); <br />• Sopwelch or usher timo-meamrameu device <br />capable of meuoring a 1 -second immmmr, <br />• G.keting material (rhe purpose of Lae g.- <br />keting material is to provide an afndght seal <br />between the l.t cover and the spill bucket.). <br />FIGURE 6.2. The cover must males a light •sal wlm the <br />split bucket to Prevent leakage when me vaouum A <br />puled during Ins teal <br />axploalorvproof motor. Vacuum pumps <br />with slechlo Motors that ere not sspl0- <br />.1o,pnmf may Ignite Il....1do vepo.. <br />If • portable .1, oomp.... A, 1• used, It <br />should be located at I ... t 20 feet away <br />from the ventud eduotor As outside any <br />Class I, Division 1 area. <br />6,3.4 Preparation. <br />L Remove and properly dlap.e of any liquid end <br />debris (leaven, Sediment and muJh) In the split <br />bucket. Cleat the spill bucket And Aria. It for <br />damage, defects or Imp.NHY lastnlled compo - <br />rants. if them ora I.- --p-m- (.a., loose <br />bund thumps or bell.). lighten true Items before <br />perfmnhng the integrity test. If them are itomt <br />the( rust be repaired or replaced (e.g.. dstado- <br />rated gaskets/awls or drain valve..), notify the <br />wnerfupemtur to obtain epp.v.1 beton, pm- <br />-ding with the ceded mpsin. <br />2. Estrada. the fin cap and .Jap- no[ng fur <br />]-A, mini ng or damaged Pena and make neo <br />awry repairs. Make sure that the seal .n the fill <br />cap Is present and in good condition. The cap <br />mut f,, u-naly and be kwk-tight on the dao. <br />A leaking up will -11 In . failed test. As an <br />alternative to • light nil cep, use a plumber'. <br />plug in the fill d- <br />1. The spill huaku drain valva, H present, must be <br />leak -tight m p.a rhe tut. If de drain valve la <br />as le.k-Light. 1, may be ...,ad und penm- <br />nenLy plugged. <br />NOTE: Before permanently plugging, anmrc <br />that local mguladom allow the draln valve to <br />be pcoomma Wy plugged. <br />4.0em any eontamlne6- fium the top surface <br />of the spill bucket wh<ra the cave' make a serol <br />old line it with gaskding maudel. <br />s. place the wt cover on the spill bucket, con - <br />finning the, it makes . tight seal with the ges- <br />ketimg material. <br />8, Connect he it.. fmm the vacuum acome to the <br />adopter on the cove. <br />7. tithe *11 bucket Is rand to have cracks, loose <br />pm or separuiun of the bucket fmm the fill <br />