Laserfiche WebLink
pipe, it Is nm ...side=d to be Ilquld-light. TLs <br />visually Indicates s col failure. <br />6.S.6 Test Proeedure. <br />1. Slowly apply • v %um at 30 Inches wmor <br />column to flu spill tback,, and sloe the vnlvs <br />IP a 30 -Inch water column vacuum canna be <br />,Wood, me spill bucket fulls the wt. Sea <br />Appendix 8 for pmmu. and v-.nl cel <br />2. Start the tirr-malmum device .,it record <br />the initial va.un, level shown on the gauge, <br />S. After I Oduce, meeud die ending vacuum levet <br />Upas, complotiw of the drat, reto- me vacuum, <br />rent"n tike test apparatus and file gakadng muco - <br />flat train the spill bucket and replace the six Clint <br />cover. <br />FIGURE ". The veauum test method can defeat. aplll <br />bucket leen by fneeaedng the'hinge In vacuum I-' <br />dudng Ne teat <br />6.3.6 Paas/Ful Criteria. tfd,e ending vacuum <br />level is 26 inches water column or greater, the ryill <br />bucket pm- it,- Cast. <br />If the ending v ---m I'veIs late Ch. 26 inches <br />water column, the split bucket fail. th- teat. <br />e.4 DoublaWalfed 3p111 Buok•t Integrity Testing- <br />veouum Test Method. <br />6.4.1 purpose. Tills method la used m tom the <br />integrity of the print" and ace -dart' cute resent <br />of the dnuhle.welled spill bucket. <br />6.9.2 EG is of Test. A partial v.cuum s <br />applied to the imarathlal spw. between the primary <br />and -Mary containment. The -nor- ]--I Is <br />.O_1,.ted for a I -minute period. <br />6.4.3 Teat Equipment. Test equipment shall <br />include: <br />• 'Han um test eppnmtns [the tut app-,-- may <br />be available fmm if,. apil"Cickal manufacturer. <br />It include. an air prousure regulator, CE vaautn <br />mumm,. 'hems. ganga with . minimum 0-30 <br />,nob <br />water cn'umn range, a lest ndng and a <br />can rel valve. The control valve Is I'M I. adjust <br />the vm:uum level J; <br />• ..pw..h a aha Cine-memurcmwt device <br />capable of mcnsudng a I-rccond Increment. <br />WARNING: Use only an mrroperated vis- <br />or is <br />vacuum pump powered by <br />m explosion -pmol .afar. Vacuum pompe <br />with.1-tri. mot.n that a not axpio- <br />.IomProot may Ignite flammable impose. <br />II is <br />portable els mmp.... 1, n used, It <br />should be ':noted at least 20 feet .wry <br />Isom the vantinkiluctor or outside any <br />Csu I, Division 1 area. <br />FIGURE BA. Check Gnu and connections to ensure <br />that "ey are tuts -light before sterling the teat <br />6.4.4 Prepentlon. <br />1. Remove and p.p.ly dl.puc or any liquid and <br />debria (laevaa, sediment and trash) In the spill <br />buck.. <br />®.bahorg �'ti:�'.`��^�.�kr�vs�`tick=,i'u;r.�?;�`'L�``r°;s�'h;;•,�`.t��:�r�i�:�';'•�7�l�;pei�i_. -. <br />dam ,so items film mad he repaired car replaced <br />(e,g., dcmrmna-d pearemad n fining bums), <br />,.,try the owner/Opemur and ab- appnrval <br />prior T: p -ding with repnim. <br />4. Test bout Or acundury anninmenl tamina- <br />tion fitting' must be'reaert nn the piping Pen- <br />emCing the romp. During Testing. mcrc finings <br />prevail wales fmm alering the In""tidel -pact <br />of double-wmlad piping. Wlmua Ihue fiuingg, <br />Th. <br />inugrity of the sump sauna d luted wing <br />this -Tied. <br />S. If lumniddai mm,ilm-ing rcmnn am present <br />within me comtim"" 'crops, te.p.radly <br />vs them be(- anduaing die keel. If the <br />moved, mpoaitem after waling to <br />app.priou p..iuon sanding to the monafa- <br />(umr'e instruction'. <br />S. If du containment sump is found m hove traces, <br />Iwo pars or apararl.n or any. ainn err petwre- <br />don Nnings, II Is ..I analdered to be liquid- <br />II&C.This visually indirta n lest Hilum. <br />CAUTION: Water can damage electrleal <br />conmotion. Ensure the t there ere no <br />emrpammd: that sen be damaged by the <br />addition of water to the sump, If auto <br />ompancnts are present, take appropriate <br />preosutlons When perfomdng the lest or <br />... nn ettemstive test method. <br />FIGURE B-6. The fast fluid lave" In the d"' must be at <br />least 41naGex .bow the Mgham sump Pmetratlon or <br />sidewellseem. <br />Qpel.org <br />e.5.6 Teat Procedure. <br />1. Begin the tat by adding wa- to the wmP To 0 <br />minimum of 4 inches above Che highest sump <br />pencre III or sump eldewall sem, whicluvcr s <br />lghen To ampere for sump JeM<aiw, the <br />wamr most be e'1nwM to settle is minimum of <br />15 minus before inking UE. mid -1 um mes.ae- <br />an- If the highest sump paneuadon or comp <br />,idewall cam 1. leas than 4 Inch. (On"Lha cop <br />or me sump, add water to within I Inch of the <br />tp at til. sump. <br />2. Piece the measuring stick vertically at the lowest <br />point in me sump and extending above me water <br />level In the sump 1. o)law rot as eccurammee- <br />em to be token. The location of the mu- <br />s m <br />ringmiek .,.It remain sesame for each water' <br />levelma-mrsiort. I) --t the initial wets <br />''vel measum rcH, a, mc"umd from IM bottom <br />of the romp. All -live meosu=ma' metlwdr <br />may he used provided that the measurement to <br />1116 (n.O(d) inch can be ream. <br />3.'fuko ell P=camtans to prevent the "mor level <br />fmm being disturbed during Tho dacha of the <br />les,. <br />4. After I hour, dowmal the ending wmor love' <br />menmmmeni. <br />6. Upon amp'm'on or the test: <br />mrsow, .11 armor suit resiliently depose or h <br />accudmg to Section 6.7; <br />• reinstall any Immnt(del monitoring sem:ms in <br />their proper' positions; <br />• velum the last bunts ar, secondary comin- <br />nuo filling'' m their pre-test .pereling an <br />flgurntws; <br />FIGURE r±-5. He prevent lenk.ge, check all genet -0- <br />fltring. before adding wamr 1. enure thaymnka a tight <br />ami. <br />t. <br />forammanded mcUea for at, 7"tkq andVMlk.dan 41501, OWM,tnt Cmectim and Srcendary Caadranent Equipment m UST Refill" <br />2. Clem, the sign bucket and examb,e it for dmn- <br />6.5.1 a .... at. Cnnu rimcot amp, oro liquid. <br />age. Make cure That It la frea of cm.s, loom <br />right anacams deigned m femporally -"-I- <br />Paris at scpa.ion of the bucket from the fill <br />look, or spills. b, addiliun, containment camps <br />pipe. If the spill bucket Is damaged notify the <br />arms I..- <br />often saint na the Icnk detection ...,,arms <br />nwicelopben. <br />-walled piping systems. tk,p <br />armIts,cimble .ea <br />� C • <br />from the primary tontines typically news by <br />3. Attach thele" npp.nnn to the less port. <br />grnvlry Inside the aecandasy, cowinmenl m the <br />4. Connect The line hem the vacuum soamc m illsump, <br />whoa It an be andly oh crud or domed <br />test apparatus. <br />by IT [oats. <br />S. If the spill bucket la found to have aurin, Ino <br />This action ducA[- it hydmarmic test mamod. <br />parts or aepumial of the bucket from d,e fill <br />Them are vacuum tat' mahods available for con - <br />pipe, it isnot eonddemd u be liquid-tighl. This <br />Taintnenr aumps. Consult it,. mamfanmr before <br />visually Indlomu a cul failure. <br />performing s veeuum tout. <br />6.4.5 Teat Proeedure. <br />NOTE: Fallow me mawfano-'s inat.'li:ns <br />L Slowly apply n m or 15 limits, wamr <br />who, Luling the inmretitild apnea of double - <br />caiumn To he spill.b,.W imermitial sp.- and <br />wailed containment sump&. <br />The consul va. If a 15 -Inch water col- <br />clam vd <br />umn menam runs he att.l.d, the spill bucket <br />e.5.2 Purpose. This seetla dearibes the pmp- <br />fails be teat. Sea Appendix 8 for premum .it <br />..if.., and pmcdures to test Na Integrity of em,• <br />vauum cony mics. <br />Lid=1 sumps to ensurs he, they do net Icnk. <br />2. Stan the Iime-meaurement device and -.,d <br />6.5.3 Description of Test. The conainmem <br />the initial vacuum level shown m, the gwg, <br />sump is filicd to the proper level with wider. The <br />3. After I minute. record Tho ending vauum level. <br />mls levelmeasured I the beginning and end of <br />U. sou. <br />Upon complcion of the tot, sekaae the vacuum, <br />move Ch. drat app -t.. and swore the spill <br />6.6.4 Test Equipment. Test rquipmenr shall <br />bucket To lis nuns' Operating cundid.n. <br />include: <br />6A.6 Pass/Fail Cdterls. If the ceding vacuum <br />level s 52 inches wamr caw.. or greater, the spill <br />bucket paa. the last. <br />Ir the coding vacuum )..11, Iran than 12 inches <br />inner cu1Omn. ilia spill buekel full the IW. <br />e.e containment Sump Integrity Testing. <br />CAUTION: Gaining aocesa to the cont -11" <br />mart sump require. .moving the Ild, <br />err dip,eer Deml that s In piss• to <br />prootect the equipment In the sump. These <br />components can he heavy. They may <br />require spealai handling and more than <br />one person to remove them. Use caution <br />when moving and replacing them when <br />testing la ...plate. During the test, put <br />the cave. and panel. In a sere I ... tlon <br />whore they or. secure and Isolated ban, <br />vehicle and oustomar traffic. <br />. coal.: <br />• measuring mirk mm s arunm m within I/16 <br />(U.U63) Inch and of w"hcienT Icngd,; <br />• upwsreh o nuts time-meawmnent device <br />capable of inemuring o I-secoml Increment. <br />8.&6 Prep-d.n. <br />i. Core shanld be "ken when conducing the tut <br />In rine min a during rrwjng weather wndi- <br />dom. <br />2. Remuve and properly dlsticae:f any liquid gild <br />dentis (leaves, sediment and mah) In the con- <br />talnment sump. <br />S. Inspect the comelmucnt sump far • damage. <br />Examine all penetmdon fdlinga, c.,duits, jnne- <br />tion boxes, caps and Eisen (If presen), and Ill <br />wall scumm, for defucs, damage or improperly, <br />(stalled components. If there am it- aam- <br />pamea (erg., loose penetration fitting dmnp, <br />or inlning Inteestidm [Pum cape), coned duos <br />Item. barure perraming the integrity tut. If <br />.•i w s ,.•... , fs ah, .h.:.t t,'' .. L`Pei.org.� <br />it-anaded nacks, ret IheT"dnp ed VMa<etlan of Sptll Wn141, leek peterfon and armdary Comdanent Equlpmenr n Un Fedfdm <br />• Inspect and minetell all comalnmmt sump <br />If the wamr level changes IIe(0.125)inch orgreat- <br />lids, 8. its ..it covers, <br />err, Iha contairm cat sump falls The Isegri y tut. <br />6.5.1 Pass/F.11 Criteria. If Ilse water level <br />6.6 Accelerated Preelel:n Hydrostatic Teel for Split <br />changes less titan 1/8(0.125) Inch, thoconmin.eni <br />Bucket. and Containment Sump.. Blect.nle precl- <br />sump passes the inugrity test. <br />sloe lest equlpunt esn be utilised to um spin buck., <br />and a.mirenmcnt sumps. It Incorporates mom musidve <br />� C • <br />equipment mm pt, s wt to he w,dn.M In s ahnner <br />-' _ <br />period of line The proceduma me du came= Meld and <br />' 1 ` <br />tun the creme volume as other methods aci lnM In his <br />v <br />chepa. Thammifaehner of themaaummentequipment <br />,.• <br />should specify the precision end duration or the Carl ",d <br />,• <br />the pmarrall erTrade. Be -,at. p.0.11 erie ri. should <br />nes be les stringent than these pmaeribed rat du I -bar <br />FY: ...... <br />test In Section 6.5.7. <br />FIGURE 6.7. The text nuld leval In In. tank sump must <br />W at Invest 4 Inches above The highest sumpp millo <br />Uon err sidewall ream. <br />FIe{II HE 6.6, MeasuringaUelA Wed to....am Th. <br />wamr level slwuld ba'ecumry mounted to ensure that <br />they do Pat mous during the fest <br />Thu data ,rl for Section 6.2 or U may be used for this <br />Cast. Rarer to Appendix D. <br />6.7 Proper Dl,po.el of Test Liquid.. Tut liquids <br />num be disposed of property. Chcck whh The AHI <br />.gnrdl.g rcquimm'nts fist proper diapoe.l. <br />�'; ,UST,AYI5fE1R1E�;�R4lFME.NT: <br />Although The WecWorre- of -1111 prevantlou devices <br />an be trend by attempting to ovedili a UST with <br />product and dom.d.1ng I- well the device funcdon, <br />,his .ppmEmh I. at .commended. Any malfuaaion in <br />the overfill p arcruon device could result In a product <br />return gat amid result In a rarest to public health and <br />safety and ervI..... x.I dealing.. <br />pedant UST lulu require Th.,. -sill prevauon cquiP- <br />mat summmicmly routict flow err drat the Usnafa <br />upammr when the lank Is no mom lbs 90 percent full <br />or shut oft now into a rank when it Is no mom than 95 <br />percc,LL full. other aimmelives to prevent am ilia sat the <br />rutrlaion, of flow during is delivery 30 minute. prior to <br />ovefifling; alerting me operator I minute before overfill - <br />Ing may -.1,, or sulmsildcally shorting u(f now into is <br />Ionic m thus none of tie filling. located on cep of il. talk <br />e= exposed m product dee m over In"" <br />The committee hes wrltia Iha ree mnwnded practices <br />for automade shutoff devle= to reflect that the devices <br />mast he to to shut off now when the tank 6 no mom <br />data 95 paged, full, and new =,talon and erveifill <br />PaLo(9, <br />1 <br />