My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:10:10 AM
Creation date
6/22/2020 7:52:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLANS
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM : GRD PHONE N0: 9 267 5370 <br /> Mar. . 09 1999 11=48IM PS <br /> be obtained prior to beginning field work Three soil bb monitoring wells are proposed at the <br /> locations shown on Figure 2. All drilling equipment shall be thoroughly cleaned prior to drilling and <br /> between individual borings to prevent the introduction o F contaminants from off site or between <br /> boring locations. <br /> The soil borings shall be advanced with hollow-stem drilling equipment fitted with a bit with sufficient <br /> diameter to drill a boring in which a two-inch diameter mon toring well can be installed. Borings shall <br /> be logged by a California Registered Geologist using the I Ynified Soil Classification System. A log I � <br /> of each boring, including; soil and lithologic descriptions, c lepths of water bearing zones, petroleum <br /> contamination shall be kept during the drilling operation. <br /> Soil samples shall be collected usingindustry-standard stry-standard' and sample handling procedures: Soil . <br /> samples shall be collected at depth of four and eht feet bg using a split barrel sampler driven ahead , <br /> of the bit. The saxrpler tool shall be fitted with two-inch er, clean,brass sleeves to retain the <br /> sample for transport to the laboratory. The brass sleeves be sealed with Teflon sheet and plastic <br /> end caps. <br /> The well borings shall be advanced to 20 feet bgs or appy xirnately 10 feet below the groundwater, <br /> level. The static groundwater level was n*awred at approximately nine feet bgs on 21. January 1999: � <br /> The monitoring wells shall be constructed with two-inch solid PWC casing and 0.020-inch slatted <br /> casing(factory-milled well screen). The well screen shall set from approximately five to 20 feet <br /> bgs. The solid casing shall extend from to approximately .5 feet below ground surface to allow a <br /> flush surface completion. A filter pack of#3 sands be placed around the well screen to <br /> approximately one foot above the screen. A one foot filter of bentonite Chips shall be placed on <br /> top of the filter pack_ The sanitary seal shall extend from t ie top of the filter seal to approximately <br /> ane foot bgs. The surface shall be completed with a traffic-rated vault box. <br /> The monitoring wells shall be surveyed to obtain the relative elevations of'the ground surface and top- <br /> of-casing(TUC), and the horizontal positions. The depth to groundwater shall be measured from the <br /> TUC to determine the groundwater gradient. <br /> The monitoring,wells shall be developed until the water appears clear of sediment or until five well <br /> casing volumes have been extracted. Water extracted from the monitoring wells shall be placed into <br /> appropriate containers and left on site for disposal by the property owner. The groundwater in the <br /> well shall be allowed to stabilize for at least 24 hours after w4l development before commencing with <br /> samPfing- <br /> 13. Collection wd—A_na_Iygg of GroundwaAer Samnles <br /> Prior to sampling, the static groundwater level shall be measured from the TOC for groundwater <br /> gradient determination_ As monitoring well purging Pro s, the extracted groundwater shall be <br /> evaluatedfor the field parameters pK electrical conduct' , and temperature. At least five well <br /> volumes shall be extracted in.preparation for sampling. <br /> WORKPLAN FOR LIMITED SOIL AND GRO UND WATER INTIESTIGATION <br /> SUNNYSIDF, PRODUCE, THO.RNTON, CALIFOIWU PAGE 3 <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.