Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Sunnyside Produce <br /> Job Location: 8950 W. Walnut Grove Road, lbornton, CA <br /> Client Name: Mike Manser. <br /> Project Number: 99-314 <br /> General Work Description: Advance soil borings to collect soil and groundwater samples to <br /> investigate current subsurface conditions related to a f rmer underground gasoline and diesel fuel) <br /> storage tanks. <br /> SSP Prepared by: Sean Garvey <br /> On-site Safety Officer: Sean Garvey/John Lane i <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP mut be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. <br /> I <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GZA at the job site. All personnel working for GZ4, at the jab site must read this SSP, and sign <br /> the attached Compliance Agreement before entering th work area. Field personnel may deviate i <br /> from the safety provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements. GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. If I� <br /> changes in site or working conditions require changes in safety procedures, appropriate' <br /> amendments to this SSP will be provided by the GM project manager or supervisor, with the i <br /> written approval of the GZA Health and Safety Director <br /> i <br /> PAGE 1 <br />