My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:10:10 AM
Creation date
6/22/2020 7:52:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLANS
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN J <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZ4 work sites. Level D includes: <br /> V Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required, include thell <br /> conditions under which the level of PPE would be modified for each task. <br /> .......... <br /> ..... ...... <br /> ............ <br /> r <br /> C. <br /> None Working Near Vehicle Orange Vests <br /> 1,2 >20 ppm for 5 minutes 1/2 Face Respirator <br /> 1,2 7200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZ4 hazardous waste sites. <br /> Site will be secured as follows., Fencing will be used when possible. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> IE t <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN J)ONE. <br /> PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.