Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN I <br /> On-site communications: ❑ Radio ® Verbal ❑ Hand Signals I <br /> ❑ Other <br /> Designate hand signals here: <br /> I�Off-site communications: ❑ Radio ® Telephone <br /> E <br /> ❑ Other <br /> f <br /> The specific signal for an emergency is: Verbally Given <br /> I <br /> The specific signal for an evacuation is: Verbally iven l <br /> I <br /> li <br /> Evacuation assembly point is: Office building <br /> MARK EVACUATION ROUTE(S) ON SITE MAP ❑CHECK WHEN DONE !' <br /> h <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated versonal protective a ui ment i.e. loves coveralls will be Maced on and <br /> covered with 6-mil plastic sheeting alona with the drill cuttings—, <br /> 4 <br /> Location of Wash Water: At site. ` <br /> I <br /> Location of Toilet: At site. I I <br /> .F <br /> Location of Drinking Water: At site. <br /> ii <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCjj ON SITE MAP O CHECK WHEN DONE !� <br /> 'I <br /> Equipment Decontamination Procedure: Eq Apment will be washed with a trisodium <br /> ph sphate solution and/or steamcleaned. <br /> i <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> de ermined. <br /> PAGE S <br /> i <br /> I� <br />