Laserfiche WebLink
1.INTRODUCTION <br /> Construction of Phases 1 and 2 is documented in two respective as-built reports <br /> (CH2M HILL,2005 and 2007b). <br /> 1.2.4 Monitoring and Reporting Program <br /> The previous MRP No. R5-2004-0803 was issued on January 30,2004,by the RWQCB.In <br /> addition to monitoring general groundwater conditions,this previous MRP was developed J <br /> specifically to monitor the bioremediation pilot test, as described in the Bioremediation Pilot <br /> Study Work Plan (CH2M HILL,2003). The MRP required detailed quarterly groundwater — <br /> monitoring,semiannual reports for the first semiannual period (fourth quarter 2006 and first <br /> quarter 2007) and for the second semiannual period (second and third quarters 2007),in <br /> addition to semiannual electronic data reports submitted for the second and fourth quarters. <br /> The current MRP,No. R5-2007-0831,was issued on November 29,2007,by the RWQCB. <br /> This MRP was developed to monitor current Site conditions with MNA and <br /> phytoremediation as remedies. This MRP eliminated most of the parameters added in the <br /> previous MRP to monitor the bioremediation pilot test, eliminated unnecessary monitoring <br /> wells and parameters,allowed for the destruction of unnecessary monitoring wells,and <br /> allowed for the destruction of the soil vapor extraction well system. <br /> J <br /> J <br /> J <br /> J <br /> 14 ES102411163308SCOILW3521.DOCXI112970003 <br />