My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GES <br /> • GENESIS ENGINEERING REDEVELOPMENT <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION....................................................................................................... 1 <br /> 2.0 FIELD PROGRAM.................................................................................................... 1 <br /> 2.1 Site Reconnaissance, Preparation, and Restoration.................................................. 1 <br /> 2.2 Sampling and Logging Techniques ..........................................................................2 <br /> 2.2.1 Sample Collection................................................................................................. 2 <br /> 2.2.2 Subsurface Logging..............................................................................................2 <br /> 2.3 Decontamination Activities ...................................................................................... 3 <br /> 2.4 Waste Handling......................................................................................................... 3 <br /> 2.5 Surveying.................................................................................................................. 4 <br /> 3.0 ENVIRONMENTAL SAMPLING............................................................................ 4 <br /> 3.1 Soil Sampling............................................................................................................4 <br /> 3.2 Sample Handling....................................................................................................... 6 <br /> 3.2.1 Sample Labels.......................................................................................................6 <br /> • 3.2.2 Sample Identification............................................................................................6 <br /> 3.2.3 Handling and Shipping .........................................................................................7 <br /> 3.2.4 Sample Size, Preservation,Holding Time............................................................7 <br /> 3.3 Sample Control......................................................................................................... 8 <br /> 3.3.1 Chain-of-Custody Record..................................................................................... 8 <br /> 3.3.2 Custody Seals........................................................................................................ 9 <br /> 3.4 Quality Control Samples........................................................................................... 9 <br /> 4.0 FIELD QUALITY CONTROL PROGRAM......................................................... 10 <br /> 5.0 RECORD KEEPING................................................................................................ 10 <br /> FIGURE <br /> A-1 Boring Location Map <br /> ATTACHMENT <br /> A-1 Field Forms <br /> • William DCPaoli Property i <br /> Sampling and Analysis Plan <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.