My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEFE� <br /> • GENESIS ENGINEERING&REDEVELOPMENT <br /> 1.0 INTRODUCTION <br /> This Quality Assurance Project Plan ("QAPP") has been developed for the Work Plan to <br /> Establish Background Concentrations in Soil and Groundwater("Work Plan") at the <br /> William DePaoli Property located in Holt, California("Site"). Genesis Engineering& <br /> Redevelopment, Inc. ("GE&R")will implement this QAPP in conjunction with the Work <br /> Plan and Sampling and Analysis Plan("SAP"). The Work Plan contains a summary of the <br /> work to be performed to establish background concentrations; and the SAP contains a <br /> description of the field procedures and sampling protocols to be used in implementing the <br /> Work Plan. <br /> This QAPP outlines the policy, organization,and functional activities for the corporate <br /> Quality Control ("QC")and Quality Assurance ("QA")programs that have been instituted to <br /> ensure that field data are collected according to approved procedures,to detect deficiencies <br /> that may affect data quality and usability, and to provide corrective actions when appropriate. <br /> The corporate QC procedures were developed to ensure the orderly and reliable collection of <br /> reproducible field data;the orderly and consistent analyses of field data; the orderly <br /> • development of conclusions, future actions, and costs based on the data analyses; and the <br /> review and input of Senior Staff at appropriate steps in the development of a project. The <br /> corporate QA procedures were developed to create an independent system to test,verify, and <br /> document that the corporate QC procedures are being followed and a system to document <br /> and cure deviations from acceptable QC procedures. <br /> 2.0 PROJECT ORGANIZATION AND RESPONSIBILITIES <br /> This Section contains the organizational structure, levels of authority, and lines of <br /> communication for QA/QC activities. GE&R's organization of the Project includes the <br /> following key positions: Project Principal,Project Manager, Technical Coordinator, Field <br /> Team Leader, Corporate Health and Safety Officer(CHSO),and QA Manager. The selected <br /> laboratory will designate a Laboratory QC Manager to be approved by the Project Manager. <br /> The roles and responsibilities for these individuals are presented below. <br /> 2.1 Project Principal <br /> The Project Principal is responsible for the overall success of the Project's objective and <br /> ensures that needs of the Client are met. The Project Principal will communicate regularly <br /> with the Project Manager and the Client and will provide status reports to the Executive <br /> Management Team as needed. Paul Lambert will be the Project Principal. <br /> William DePaoli Property I of 21 <br /> Quality Assurance Project Plan <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.