My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GESsa <br /> • GENESIS ENGINEERING&REDEVELOPMENT <br /> and availability of test equipment). The Field Team Leader will conduct Site safety meetings in <br /> the absence of the Corporate Health& Safety Officer. <br /> 2.3 Corporate Health & Safety Officer <br /> The CHSO is also responsible for disseminating the information contained in this HASP to all <br /> personnel assigned to the Project. The CHSO has the authority to suspend work any time that it <br /> is determined the provisions of this HASP are not being met. <br /> The CHSO is responsible for: <br /> • Overall Site safety <br /> • Enforcing safe work practices <br /> • Ensuring that Site safety meetings are conducted <br /> • Inventorying equipment and supplies <br /> • Accident investigation and reporting <br /> • Workers Compensation reporting <br /> • Reviewing the HASP for accuracy on a regular basis <br /> . • The assessment of site hazards <br /> The CHSO shall review the requirements of this HASP during a health and safety meeting with <br /> all project personnel before each phase of the field activities begins. Attachment 1,the"Field <br /> Health and Safety Form", will be completed for each health and safety meeting. Safe work <br /> practices, control of potentially impacted materials, and protection of personnel and property as <br /> described in this HASP shall be emphasized during the safety meeting. Field personnel will be <br /> required to sign a certificate indicating that they will comply with the provisions of the HASP. <br /> Subcontractors shall identify their Health and Safety Officer(CHSO)by name before the field <br /> activities begin. Telephone numbers of these individuals for emergency contact shall also be <br /> provided. <br /> 2.4 Project Personnel <br /> Subcontractors are responsible for ensuring that they completely understand how to safely <br /> perform all aspects of their job at the Site. Project personnel and subcontractors will not <br /> compromise safe operating procedures at any time. If any field staff is unclear about any aspect <br /> of their job,they should immediately discuss issues with their supervisor. Project personnel and <br /> subcontractors are responsible for reporting any unsafe condition, accident, or near miss to the <br /> Field Team Leader. <br /> • <br /> Health and Safety Plan 3 of 15 <br /> DePeoh Property <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.