My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE "R <br /> • GENESIS ENGINEERING&REDEVELOPMENT <br /> 3.3.1 Head Trauma <br /> To minimize the potential for head injuries, field personnel will be required to wear NIOSH <br /> approved hard hats during all field activities. Hats must be worn properly and not altered in any <br /> way that would decrease the degree of protection provided. <br /> 3.3.2 Foot Trauma <br /> To avoid foot injuries, field personnel will be required to wear steel-toed safety shoes/boots <br /> while field activities are being performed. To afford maximum protection,all safety shoes must <br /> meet American National Standards Institute (ANSI) standards. <br /> 3.3.3 Eye Trauma <br /> Field personnel will be required to wear eye protection (safety glasses with side shields)while <br /> field activities are being performed to prevent eye injuries caused by contact with chemical or <br /> physical agents. <br /> 3.3.4 Noise Exposure <br /> • Field personnel will be required to wear hearing protection (ear plugs or muffs) in high noise <br /> areas (noise from heavy equipment)while field activities are being performed. Local noise <br /> ordinances will be observed during execution of the field activities. Any elevated noise levels <br /> from field activities will be minimized, and limited to normal working hours. <br /> 3.3.5 Heavy Equipment Limitations <br /> Vehicles and heavy equipment shall not exceed a speed limit of ten miles-per-hour in the Project <br /> area. Drivers and equipment operators will wear seat belts at all times. No riders will be <br /> allowed on heavy equipment or in vehicles unless seats and seat belts are available for their use. <br /> 3.3.6 Buried Utilities and Overhead Power Lines <br /> Boring locations will be examined by the Field Team Leader, facility representatives, and an <br /> underground utility locator service, so that utilities will be protected during drilling activities. <br /> Underground Services Alert will provide notice at least two days before beginning well <br /> installation activities. Protection from overhead power lines will be accomplished by <br /> maintaining safe distances of at least 15 feet at all times. <br /> • <br /> Health and Safety Plan 5 of 15 <br /> DePaoli Property <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.