Laserfiche WebLink
4.0 REPORTING AND SCHEDULE <br /> A draft report will be prepared once the subsurface investigation field <br /> activities and groundwater sampling are completed and the laboratory <br /> analytical results have been reviewed. The report will describe field <br /> methodologies, subsurface conditions encountered, and summarize the <br /> analytical data and groundwater flow direction. Analytical results will be <br /> compared to applicable State of California standards. <br /> The proposed scope of work will be conducted according to the following <br /> schedule. <br /> Activity Approximate Completion Date <br /> Workplan Approval by San Joaquin County Estimated 7 January 2004 <br /> Completion of Scope of Work 21 January 2004 <br /> Submittal of Investigation Report 15 February 2004 <br /> ERM 6 LESCO,WC/0024MI.00-12/21/04 <br />