Laserfiche WebLink
If mitigation implemented will <br /> Potentially Significant Impacts Suggested Mitigation Measures impact be less than significant? <br /> Project construction truck trips generated by excavation of the Because the preliminary design study in this EIR Yes <br /> site would increase the demand for roadway maintenance. cannot be considered conclusive in terms of specific <br /> roadway reconstruction requirements, it is <br /> recommended that the applicant initiate a detailed <br /> design study to determine the eventual roadway <br /> improvements needed on Davis Road, Ray Road - <br /> Kile Road prior to final map approval. It does <br /> Geology/Soils <br /> Without the benefit of adequate field testing, the installation Conduct a soil suitability study prior to tentative Yes <br /> and use of individual residential septic systems in easements map approval to identify and document the <br /> as presently planned and identified by the applicant could suitability of each proposed on-site sewer disposal <br /> result in system failures, localized saturation and site. Investigations shall include soil profiles, <br /> bacteriological contamination problems. percolation testing and winter (wet weather) <br /> w groundwater observations to verify conformance <br /> with current on-site sewage disposal regulations of <br /> the County. Studies must be approved by the <br /> Environmental Health Services Division of San <br /> Joaquin County Health Services Department. <br /> The septic system easement plan outlined by the applicant Based on the results of field investigations, Yes <br /> could result in later attempts to alter easement locations on a delineate and map the recommended disposal site to <br /> piecemeal uncoordinated basis by individual property owners serve each building whether it be on-lot or within a <br /> when they undertake their own soils and percolation testing to dedicated easement. This should be completed prior <br /> obtain septic system permits. This is a potentially significant to final map approval. Prepare and record all <br /> impact because of the increased possibility for crossing utility sewage disposal easements, including easements for <br /> lines, pipeline rupture and sewage spills. pipeline and disposal areas. <br />