My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAKE FOREST
>
2248
>
2600 - Land Use Program
>
WC-90-1
>
SU0013451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:00:53 PM
Creation date
6/23/2020 11:17:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013451
PE
2600
FACILITY_NAME
WC-90-1
STREET_NUMBER
2248
Direction
W
STREET_NAME
LAKE FOREST
STREET_TYPE
RD
City
ACAMPO
APN
00306001
ENTERED_DATE
6/17/2020 12:00:00 AM
SITE_LOCATION
2248 W LAKE FOREST RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUCKEYE RANCH EIR <br /> MITIGATION MONITORING PLAN <br /> (For Significant Impacts Only) <br /> TRAFFIC/CIRCULATION <br /> Person/Agency Timing or Frequency, <br /> Mitigation Measure 1Vr0utornn ltequicemelnt5 Respons�blei of Momtoringa <br /> The project's collector streets should be Approval of site and grading SJCDPW C <br /> constructed to include one 10-foot wide paved plans and visual inspection. <br /> travel lane in each direction with 4-foot wide <br /> gravel shoulders, for a minimum overall road width <br /> of 28-feet. <br /> The portions of Davis Road, north of Peltier Road Visual inspection. SJCDPW PC <br /> which have corners too narrow for excavation <br /> trucks to negotiate, should be widened and repaved <br /> to accommodate large truck turning movements 48- <br /> foot turning radius or 96-foot minimum turning <br /> path diameter preceding the excavation process. <br /> The applicant should initiate a detailed design study Approval of study and design SJCDPW PC or PO <br /> to determine the eventual roadway improvements recommendations. <br /> needed on Davis Road and Ray Road- Kile Road <br /> prior to final map approval. <br /> 1. SJCCDD:San Joaquin County Community Development Department;SJCBD:San Joaquin County Building Department;SJCDPW:San Joaquin County Department of Public Works; <br /> USACE:U.S.Army Corps of Engineers;SJCFCE: San Joaquin County Flood Control Engineer;RWQCB: Regional Water Quality Control Board;CDFG:California Department of <br /> Fish and Game;SJCEHD:San Joaquin County Environmental Health Department;DHS:California Department of Health Services. Those responsible would maintain monitoring records <br /> and verify compliance with mitigation measure. <br /> 2. FM: Final Map; PC: Pre-construction stage;C:Construction stage;PO: Post-construction stage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.