Laserfiche WebLink
GEOLOGY/SOILS <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure Monitoring Requirements Responsible' of MonitorinO <br /> Conduct a soil suitability study prior to feral tentative map Complete studies to the SJCEHD FM, PC <br /> approval to identify and document the suitability of each satisfaction of the County. <br /> proposed on-site sewage disposal site. Investigations shall <br /> include soil profiles, percolation testing and winter (wet <br /> weather) groundwater observations to verify conformance <br /> with current on-site sewage disposal regulations of the <br /> County. <br /> Based on the results of field investigations,delineate and Revise site plan and SJCEHD, RWQCB FM, PC <br /> map the recommended disposal site to serve each building develop septic disposal site <br /> whether it be on-lot or within a dedicated easement. This easement plan. <br /> should be completed prior to final map approval. Prepare <br /> and record all sewage disposal easements, including <br /> easements for pipeline and disposal areas. <br /> Include,as a condition of the homeowner's association Develop plan and SJCEHD, RWQCB FM, PC <br /> CC&Rs, provisions for inspection, maintenance and repair conditions of project <br /> of all pipelines, leachfields and related septic system approval. <br /> features located in easement areas of the project. As <br /> provided in the County regulations, the CC&Rs shall <br /> include, at a minimum, provisions for: (1)hiring suitable <br /> maintenance personnel to conduct this work; (2)authority to <br /> collect fees from homeowners to support the inspection <br /> work; and, (3)responsibility to inform the San Joaquin <br /> County Health Agency of problems requiring repair work. <br /> Design and install all pipelines, leachfields and related Construction phases should SJCEHD, SJCBD FM, PC, C <br /> septic system features to be located in easement areas prior be devised to clearly state <br /> to completion of common areas (e.g.,golf course) that could time of septic system <br /> be affected by the excavation work. Also, install dual (200 installation. <br /> percent) leachfield systems with a diversion valve to <br /> minimize or void the need for future leachfield replacement. <br /> This is recommended because of the unique easements in <br /> the golf course proposal. <br />