Laserfiche WebLink
Geology/Soils (Continued) <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure MonitongReyuireanents Responsibtet of Monitoring2 <br /> n <br /> Plan grading work to avoid operation of heavy equipment in Prepare grading plan that SJCCDD, SJCBD FM, PC, C <br /> areas to be used for leachfield systems, and generally avoid includes restricted areas. <br /> heavy equipment operation when soils are wet and <br /> especially susceptible to compaction. <br /> 1. SJCCDD:San Joaquin County Community Development Department;SJCBD:San Joaquin County Building Department;SJCDPW:San Joaquin County Department of Public Works; <br /> USACE:U.S.Army Corps of Engineers;SJCFCE: San Joaquin County Flood Control Engineer;RWQCB: Regional Water Quality Control Board;CDFG:California Departmentof <br /> Fish and Game;SJCEHD:San Joaquin County Environmental Health Department;DHS:California Department of Health Services. Those responsible would maintain monitoring records <br /> and verify compliance with mitigation measure. <br /> 2. FM: Final Map; PC: Pre-construction stage;C:Construction stage;PO: Post-construction stage. <br />