Water Resources (Continued) <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure Monitoring Requirements Responsible' of Monitoring <br /> The applicant should incorporate water conservation Prepare drought plan. SJCCD FM, PC <br /> measures and other project design modifications, as <br /> appropriate, to demonstrate the adequacy of the water <br /> supply to meet expected water demands. This should <br /> include an itemization of drought planning/contingency <br /> measures such as: <br /> • reducing the overall amount of area to be <br /> irrigated (i.e., golf course, vineyard, <br /> pasture); <br /> • restricting the watering of the golf course <br /> during drought periods; and, <br /> • use of native and drought tolerant plant <br /> species wherever possible. <br /> The elevation of the lowest finished floor for each Review of grading plan and SJCBD PC, C <br /> homesite should be a minimum of one foot above the on-site inspection <br /> 100-year water surface elevation. This could be <br /> accomplished by fill, or by placing the homes on piers <br /> or piles with grade beams supporting the finished floor <br /> above grade. <br /> Erosion and sedimentation impacts from the project Prepare erosion control plan. SJCBD Post-storm monitoring <br /> site are expected to be confined predominantly to the C, FM, PC <br /> construction phase of the project. Construction related <br /> erosion and sedimentation may be mitigated by the <br /> implementation of the following measures: <br />