Laserfiche WebLink
Water Resources (Continued) <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure ;Monitoring RequirementsResponsible' of Monitoring2 <br /> • The project grading plan should include an <br /> approved drainage and erosion control plan <br /> to minimize the impacts from erosion and <br /> sedimentation during grading. This plan <br /> should conform to all standards adopted by <br /> San Joaquin County. This plan should <br /> include procedures such as: (a) restricting <br /> grading to the dry season; (b) protecting all <br /> finished graded slopes from erosion using <br /> such techniques as hillslope benching, <br /> erosion control matting, hydroseeding; (c) <br /> protecting downstream storm drainage <br /> inlets from sedimentation; and, (d) use of <br /> silt fencing to retain sediment on the <br /> project site. <br /> • After construction is completed all drainage <br /> culverts should be inspected for <br /> accumulated sediment. If sediment <br /> accumulation has occurred, these drainage <br /> structures should be cleared of debris and <br /> sediment. <br /> 1. SJCCDD:San Joaquin County Community Development Department;SJCBD:San Joaquin County Building Department;SJCDPW:San Joaquin County Department of Public Works; <br /> USACE: U.S.Army Corps of Engineers;SJCFCE: San Joaquin County Flood Control Engineer:RWQCB:Regional Water Quality Control Board;CDFG:California Department <br /> of Fish and Game;SJCEHD:San Joaquin County Environmental Health Department;DHS:California Department of Health Services. Those responsible would maintain monitoring <br /> records and verify compliance with mitigation measure. <br /> 2. FM: Final Map; PC: Pre-construction stage; C: Construction stage; PO: Post-construction stage. <br />