Laserfiche WebLink
Cultural Resources (Continued) <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure Monitoring Requirements Responsible' of Monitoring= <br /> The southern margin of the proposed irrigated pasture land <br /> must be relocated 600 feet north of the southern border of <br /> the property to prevent further degradation of the site as a <br /> result of irrigation.. <br /> Areas designated for storage of excavated landscaping soil <br /> must be moved to the eastern half of the project area. <br /> All sewage leach fields must avoid the area of high <br /> archaeological sensitivity. <br /> Native American (Miwok)concerns shall be addressed, and Status report prepared. SJCCDD FM, PC <br /> any development undertaken shall be done with their <br /> consultation. An ethnographer should determine the Preparation of report by FM, PC, C, PO <br /> relationship between these sites and Miwok oral and qualified ethnographer. <br /> traditional history. <br /> A qualified archaeological monitor with the following Require qualifications SJCCDD PC <br /> requirements must be present during all land altering or statement of monitors. <br /> excavation activities. SJCCDD and SJCBD PC, C, PO <br /> Monitor daily. <br /> • Shall have at a minimum a B.A. or equivalent degree <br /> and one year field experience, and answer to a <br /> professional archaeologist. <br /> • Shall be independent of any Native American monitor <br /> present. <br /> • Shall have the authority to stop construction activity <br /> within 10 meters of any cultural material uncovered <br /> until that find has been adequately mitigated to his <br /> satisfaction, or the project redesigned. Uncovered <br /> material could be excavated, photographed or removed <br /> at the monitor's discretion. <br />