Laserfiche WebLink
D. Results of 7estinglServicing <br /> Software Version Installed; 329.01 <br /> Com tete the followln checklist: <br /> 0 Yes rON Is the audible alarm operational? <br /> Yes Is the visual alar-n cperetional? <br /> YesWere all sensors visually inspected, funetionallytested, and confirried operational? <br /> YesWere all sensors installed at lowest point of secondary containment and positioned so that other equipment w11 not interfere with their proper <br /> operation? <br /> ❑ YesIf alarms are relayed to a remote monitoring station , is all communications equipment ('e.g ., modem) aperational? <br /> YesFor pressurized piping systems, does ,he turbine automatically shut down If the piping sacondary containmert monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically d sconnected? If yes: which sensors initiate posliiva shutdown ? (Ghack aft that appy) ® SumprTrench <br /> Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm posidve shut-down due to leaks and sensor fallureldisconnection? ® Yes; ❑ No. <br /> ❑ Yes ❑ No' For tank systems that uli ize the monitoring system as the primary tank ovenill waming device ( .e ., no mechanical overfll prevention valve is <br /> WA installed). Is the overfill warning alarm visible and audible at the tank fill point(s) and operating property? If so, at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitw:ng equipment replaced? If yes, identify specific sensors, probes, or o:har equipment replaced and list the manufacturer name <br /> and model for all replacement parts In Section below. <br /> ❑Yes' ® No Was liquic found inside any secondary containment systems designed as dry systems? (Check a.Nthat apply) <br /> ❑ Product ❑ Water. If yes, describe causes in Section E, below. <br /> ® Yes ❑ No` Was monitoring system set-up revlowed to ensure proper settings? Attach set up reports , If applicable <br /> ® Yes ❑ No' Is all monitoring equipment operational per manufacturer's specifications? <br /> in Section E below, describe haw and when these deficiencies were or will be corrected. <br /> E comments: <br /> I <br /> E <br /> Monitoring System Certification Pago 2 of 4 2121107 <br /> E <br /> [ inn <br />