My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18806
>
2300 - Underground Storage Tank Program
>
PR0232388
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2020 9:41:18 AM
Creation date
6/23/2020 1:01:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232388
PE
2361
FACILITY_ID
FA0003607
FACILITY_NAME
WOODBRIDGE AM PM*
STREET_NUMBER
18806
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258
APN
01543010
CURRENT_STATUS
01
SITE_LOCATION
18806 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. ln-Tank Gauging i SIR Equipment: ® Check this box If tank gauging Is used only for Inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed If In•tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ® You ❑ NW Has all Input wiring been inspected for proper entry and termination, including testing forgroundfaults? <br /> 19 Yes ❑ No` Were all tank gauging prones %Asually inspected for damage and residue buildup? <br /> 19 Yes ❑ No' Was accuracy of system product level readings tested? <br /> ® Yes ❑ Noe Was accuracy of system water level readings tested? <br /> ® Yee ❑ No` Were all probes reinstalled property? <br /> WIN <br /> Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ` In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed . <br /> Com plate the followingchecklist: <br /> �I Yes ❑ Noe For equipment startup or annual equipment certification, was a leak simulated to verify LLD perfomlance? (Chock all that apply) <br /> ❑ <br /> NIA Simulated leak rate: 0 3 g. p.h.; ❑ 0. 1 g p.h , ❑ 0.2 g.p. h <br /> ® Yes ❑ Noe Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No" Was the testing apparatus properly earibmtod? <br /> ® Yes ❑ Noe For mechanical LLDs, does the LLD restrict product flow if It detects a leak? <br /> ❑ <br /> NIA <br /> Q Yes ❑ No` <br /> N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> �] <br /> ❑ Yes ❑ Noe For electronic LLDs, does the turbine automalioaxy shut off if any portion of the monitoring system Is disabled ortisconnected? <br /> �{ NiA <br /> ❑ Yes ❑ Noe For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system melfuncfiens or fails a test? <br /> 0 NIA <br /> ❑ Yes ❑ No` For electronic Llds, nava all accessible wiring connections been visually Inspected? <br /> ® NIA <br /> �$ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> jIn Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> i <br /> i <br /> i <br /> F <br /> Moniboring System Certification Page 3 of 4 2121107 ' <br /> . . .r A . n nn n� > n I inn <br />
The URL can be used to link to this page
Your browser does not support the video tag.