My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 8:41:33 AM
Creation date
6/23/2020 1:43:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for GRANT LINE SHELL* as of May 12, 2020. <br /> Open violations from May 30, 2019 inspection <br /> Violation#209 -Failure to conduct the designated UST operator visual inspection at least once every 30 <br /> days. <br /> The designated operator failed to document the following: <br /> On the 10/26/18, 11/21/18, 12/19/18 designated operator(DO) inspection report under <br /> -Section II I <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XI. <br /> On the 1/17/19, designated operator(DO) inspection report under <br /> - Section III <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XI. <br /> -Section VI <br /> The OWNER/OPERATOR failed to provide at least one of the following: a name, signature, and date within 48 <br /> hours of receiving the DO report under the ACKNOWLEDGMENT OF COMPLIANCE ISSUES section. <br /> On the 4/10/19 and 5/8/19 designated operator(DO) inspection report under <br /> -Section III <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XI. <br /> -Section V <br /> The owner/operator failed to provide explanation of follow-up actions that will be taken for the statement provided by <br /> the DO in section III. <br /> -Section VI <br /> The OWNER/OPERATOR failed to provide a name, signature, and date within 48 hours of receiving the DO report <br /> under the ACKNOWLEDGMENT OF COMPLIANCE ISSUES section. <br /> Furthermore the DO did not conduct an inspection with 30 days of the previous inspection. The DO inspected the <br /> facility on 1/17/19 and on 2/18/19. The DO report was conducted 32 days after the 1/17/19 inspection and not within <br /> 30 days as stated by regulation. <br /> During the designated operator inspection, the designated operator shall review the alarm history for the previous <br /> month, check that each alarm was documented and responded to appropriately, and attach a copy of the alarm <br /> history with documentation taken in response to any alarms to the monthly report. Ensure that designated operators <br /> performing inspections at least once every 30 days at this facility and are including all of the required information on <br /> the reports. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#319 -No spill bucket,failed to contain 5 gallons, no means to keep it empty, or failed to be <br /> tested. <br /> The 87 Product, 89 product, and diesel product tanks UST is not equipped with spill containers that contain a <br /> minimum of 5 gallon capacity. All USTs shall be equipped with a spill container that has a minimum capacity of five <br /> gallons and a drain valve that allows drainage of the collected spill into the primary container or provide a means to <br /> keep the container empty. The spill containers listed above were tested for the 60 minute hydrostatic test with <br /> passing results, however the spill containers do not meet the five gallon requirement. Immediately contact a properly <br /> licensed, trained, and certified contractor to install an approved spill container under permit, if required, and <br /> inspection of the EHD. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.