Laserfiche WebLink
- <br /> �a <br /> k� <br /> Coca-Cola Enterprises- West <br /> USTEC Job No. 50054.03 <br /> 6.0 RECOMMENDATIONS <br /> USTEC recommends that quarterly monitoring of the site continue. The next quarterly <br /> I } <br /> monitoring and sampling will be conducted in November 1991 with the report being completed <br /> in January 1991. A copy of this report should be forwarded to. <br /> Mr.Steven K. Schneider <br /> San Joaquin County Public Health Service <br /> Environmental Health Division <br /> 445 North San Joaquin Street <br /> Stockton,California 95201 <br /> Mr.James Maughan <br /> Central Valley Regional Water Quality Control Board <br /> - 3443 Routier Road <br /> Sacramento,California 95827-3098 <br /> 7.0 LIMITATIONS <br /> USTEC's completion of this project was performed in accordance with generally accepted <br /> practices of other consultants undertaking similar studies at the same time and in the same <br /> geographical area. USTEC observed the degree of care and skill generally exercised by other <br /> consultants under similar circumstances and conditions. USTEC's findings and conclusions must <br /> r be considered not as scientific certainties,but rather as our professional opinion concerning the <br /> significance of the limited data gathered during the course of the project. No other warranty, <br /> expressed or implied, is made. USTEC does not and cannot represent that the site does not <br /> contain any hazardous substances,contaminants, pollutants, petroleum hydrocarbons, or any <br /> other latent conditions beyond ghat observed by USTEC during the course of the project. This <br /> report is also subject to the following specific limitations: <br /> i <br /> i <br /> F <br /> -F <br /> i <br /> .� 6 <br /> 3 <br />