My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007874
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1100
>
2900 - Site Mitigation Program
>
PR0507217
>
ARCHIVED REPORTS_XR0007874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:09:58 PM
Creation date
6/23/2020 2:52:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007874
RECORD_ID
PR0507217
PE
2950
FACILITY_ID
FA0007741
FACILITY_NAME
AUTO ZONE INC
STREET_NUMBER
1100
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95202
APN
11733035
CURRENT_STATUS
02
SITE_LOCATION
1100 N WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Working To Restore Nature <br /> 3315 Almaden Expressway,Suite 34 <br /> San lose,CA 95118 <br /> Phone (408)264-7723 <br /> FAX (408) 264-2435 <br /> ADDENDUM ONE TO THE <br /> REMEDIAL ACTION PLAN FOR <br /> SOIL REMEDIATION <br /> at <br /> Coca-Cola Enterprises-west <br /> Former Distribution Facility <br /> 1100 North Wilson Way <br /> Stockton, California <br /> ' Prepared for <br /> Coca-Cola Enterprises, Inc. and <br /> Coca-Cola Enterprises-West <br /> ' INTRODUCTION <br /> At the request of Coca-Cola Enterprises, Inc, of Atlanta, Georgia, and Coca-Cola <br /> L Enterprises-West of San Leandro,California(Coca-Cola),RESNA Industries,Inc.(RESNA) <br /> has prepared this Addendum One to the Remedial Action Plan for Soil Remediation. This <br /> report updates the Remedial Action Plan for soil remediation (RAP) previously prepared <br /> by U.S. Technical Environmental Consulting, Inc. (USTEC, September 20, 1991). <br /> This Addendum One describes the proposed soil remediation system; discusses the proposed <br /> scope of work to accomplish the engineering design,permitting,construction, operation, and <br /> compliance monitoring for the system; and presents a proposed schedule to perform the <br /> proposed scope of work. This Addendum One to the RAP will be submitted to the <br /> regulatory agencies involved in the project (and listed at the end of this report) for their <br /> review, comment, and approval, prior to construction of the soil remediation system. <br /> E 'E_ <br /> E <br /> E <br /> L' <br />
The URL can be used to link to this page
Your browser does not support the video tag.