My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011574
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
ARCHIVED REPORTS_XR0011574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:46:49 PM
Creation date
6/23/2020 3:42:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011574
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 4.4 Monitoring Wells <br /> Pour monitoring wells will be installed after the extent of impacted soils has been <br /> delineated The monitoring wells will be installed to evaluate hydrogeologic characteristics (such <br /> as the groundwater depths, flow direction, and gradient) and sampled to assess the presence of <br /> dissolved petroleum hydrocarbons The actual well locations will be determined after review of the <br /> soil analytical results from the soil borings <br /> On the assumption that the water table is approximately 30 feet below ground <br /> surface, the wells will be installed to a depth of 40 feet The soil borings in which the wells will <br /> be installed will be drilled using hollow-stem augers Soil samples will be obtained at five-foot <br /> intervals using the same equipment and procedures described in Section 4 3 <br /> I <br /> The monitoring wells will be constructed with 2-mch diameter, Schedule 40 <br /> polyvinyl chloride (PVC) casing connected with flush-threaded joints The actual well depth and <br /> screen interval placement will be determined in the field after the static groundwater level is <br /> measured The well screen will have a maximum length of 15 feet, the screen will extend 10 feet <br /> below and 5 feet above the water table The well screen slot size and filter pack size will be <br /> specified at the time of drilling and will be based on the lithology encountered Our review of the <br /> site-specific conditions described in the previous reports leads us to anticipate that the screen slot <br /> size will be 0 010 inches and that the filter pack will consist of Lone"2116 sand <br /> The well casing and screen will be installed through the hollow-stem augers The <br /> hollow-stem augers will be simultaneously removed from the borehole as the filter pack, bentonite <br /> pellet seal, and grout seal are emplaced The annular space around the well screen will be packed <br /> with the filter pack to a height of two feet above the top of the well screen Above the filter pack, a <br /> two-foot-thick bentonite pellet seal will be emplaced On placement and hydration of the bentonite <br /> pellet seal, the remaining annular space will be grouted to about one foot below grade with a <br /> Preliminary Site Investigation Work Plan-Draft June 30, 1998 <br /> Roberts Property(Former Vernalis Pump Station) <br /> Vemahs California <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.