My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011574
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
ARCHIVED REPORTS_XR0011574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:46:49 PM
Creation date
6/23/2020 3:42:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011574
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> cement-bentonite grout The wells will be completed below grade and covered with a flush- <br /> mounted, traffic-rated Christy box A concrete surface seal will be placed around the Christy box <br /> Monitoring well construction will be implemented in accordance with SJC-EHD <br /> well standards and permit requirements An example of a monitoring well construction detail is <br /> provided in Appendix A <br /> 4.5 Well Development <br /> Each monitoring well will be developed (1) to remove fine-grained materials inside <br /> the filter pack and well casing and (2) to stabilize the filter pack around the well screen in order to <br /> produce representative groundwater samples The monitoring wells will be developed using either <br /> a submersible pump or by surging/balling Well development will take place after the well seal <br /> has bonded to the well casing A minimum of three to five volumes of standing water inside the <br /> wells will be removed during development Well development will continue until the field water <br /> quality parameters and the clarity of the water have stabilized Well development logs will also be <br /> prepared An example of a well development log is provided in Appendix A <br /> 4.6 Wellhead Surv_ymg <br /> Wellhead elevations (determined by the top of PVC well casing and the Christy <br /> box rims) and their respective locations will be measured by a licensed surveyor Wellhead <br /> elevations and groundwater elevations will be measured from a common reference point at each <br /> wellhead The reference point will be a small V-notch cut into the top of the north side of each <br /> casing after the well has been installed The wells will be surveyed relative to a nearby <br /> benchmark and/or a U S Geological Survey benchmark having a vertical datum point referenced <br /> to Mean Sea Level (MSL) Planar coordinates for the monitoring wells will be generated to <br /> establish accurate horizontal control <br /> Preliminary Site Investigation Work Plan-Draft June 30, 1998 <br /> Roberts Property(Former Vemalis Pump Station) <br /> i <br /> Vernalis,California <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.