Laserfiche WebLink
i <br /> cement-bentonite grout The wells will be completed below grade and covered with a flush- <br /> mounted, traffic-rated Christy box A concrete surface seal will be placed around the Christy box <br /> Monitoring well construction will be implemented in accordance with SJC-EHD <br /> well standards and permit requirements An example of a monitoring well construction detail is <br /> provided in Appendix A <br /> 4.5 Well Development <br /> Each monitoring well will be developed (1) to remove fine-grained materials inside <br /> the filter pack and well casing and (2) to stabilize the filter pack around the well screen in order to <br /> produce representative groundwater samples The monitoring wells will be developed using either <br /> a submersible pump or by surging/balling Well development will take place after the well seal <br /> has bonded to the well casing A minimum of three to five volumes of standing water inside the <br /> wells will be removed during development Well development will continue until the field water <br /> quality parameters and the clarity of the water have stabilized Well development logs will also be <br /> prepared An example of a well development log is provided in Appendix A <br /> 4.6 Wellhead Surv_ymg <br /> Wellhead elevations (determined by the top of PVC well casing and the Christy <br /> box rims) and their respective locations will be measured by a licensed surveyor Wellhead <br /> elevations and groundwater elevations will be measured from a common reference point at each <br /> wellhead The reference point will be a small V-notch cut into the top of the north side of each <br /> casing after the well has been installed The wells will be surveyed relative to a nearby <br /> benchmark and/or a U S Geological Survey benchmark having a vertical datum point referenced <br /> to Mean Sea Level (MSL) Planar coordinates for the monitoring wells will be generated to <br /> establish accurate horizontal control <br /> Preliminary Site Investigation Work Plan-Draft June 30, 1998 <br /> Roberts Property(Former Vemalis Pump Station) <br /> i <br /> Vernalis,California <br /> 12 <br />