My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
0
>
2900 - Site Mitigation Program
>
PR0515450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 5:41:19 PM
Creation date
6/23/2020 3:52:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515450
PE
2960
FACILITY_ID
FA0012153
FACILITY_NAME
SOUTH SHORE PARCEL
STREET_NUMBER
0
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
WEBER AVE
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• S E C O R • <br /> Parcel 2A <br /> October 3, 2003 <br /> Page 2 <br /> Soil Disposal. Soil generated during excavating operations will be temporarily stored onsite in a <br /> secure location, in DOT -approved 55-gallon drums or a sealed roll-off bin pending characterization <br /> and disposal. Soil will be removed by licensed disposal contractor to an appropriate disposal facility. <br /> Soil will be temporarily stored onsite in a secure location for approximately 4 to 6 weeks. <br /> Back Fill of Excavations. Imported clean fill will be placed in each excavation. <br /> SCHEDULE <br /> Upon approval of the Work Plan from the RWQCB-CVR, it is estimated that implementation of the <br /> Work Plan will require approximately two to four weeks. SECOR would like to perform the work <br /> during the excavation for the implementation of the IRAP. A report detailing the findings of the <br /> excavations will be submitted to the RWQC13 thirty days after completion of field work. <br /> If there are any questions, please call us at (916) 861-0400. <br /> Sincerely, A / <br /> SECOR International, Incorporated ? OO qFESSo��2c <br /> N0.C 058399 9 <br /> Exp.(�,� <br /> Thomas Y. Parker Rusty Benkos , P.E. 'rl CML �P <br /> Project Geologist Senior Engine q�FOFCAL ��t4p <br /> Attachments: Figure 1 —Site Plan with Proposed Excavation Details <br /> cc: Mr. Robert Cochran, ChevronTexaco <br /> Mr.Tracy Sizemore, ConocoPhillips Company <br /> Mr. Greg Hardy, ChevronTexaco <br /> Mr. Bob Goodman, Law Office of Robert C. Goodman <br /> Mr. Derrick Vallance, ConocoPhillips Company <br /> Mr. Sean Sherlock, Snell and Wilmer <br /> Mr.Jerry Lile, DTSC <br /> Mr. John Rosso, Clayton <br /> Mr. Nick Nickerson, Unocal <br /> Ms. Kitty Walker, City of Stockton <br /> Mr.Jeffrey Wong, San Joaquin County <br /> Mr. Rudy V. Bilawski, Neumiller&Beardslee <br /> Ms. Margaret Dahlen, Earth Tech <br /> Ms. Nadia Wetzler, Bingham McCutchen <br /> Mr. Morgan Gilhuly, Esq., Barg, Coffin, Lewis, and Trap, LLP <br /> Cesar Chavez Central Library <br /> I:\ConocoPhillips\Phillips Petroleum\0415 Stockton Parcel 2A\Workplans\Workplan for Utility Search.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.