Laserfiche WebLink
Jun, 26, 2020 3:39PM Donlee Pump Co No, 4053 P. 5 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page a of s <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If monlfoftng panel Is used to perform leak detection monftoling. Y N NA <br /> Are the visual and audible alarms operational? ❑ ❑ <br /> Were all sensors visually Inspected for kinks and breaks in the cables and for residual bulldup to ensure that floals move freely, 11 E)functionally tested,and confinnod operalionai? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not frlleffere with their ❑ ❑ <br /> proper operation? <br /> Was monlloring systern set-up reviewed to,ensure proper sellings? [] ❑ <br /> Was the monitoring panel's backup battery visually inspected,functlonally tested,and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is delected in the under-dlspenser conlafnment? ❑ ❑ <br /> Does the turbine autornalically shut down if the piping secondary contablment monlloring system fails to operate or is electrically El [Jdisconnected? <br /> Does the turbine autolpaticafiy shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ <br /> Which sensors iniliale positive shut down? (Check all that apply.) Sump Under-dlspenser containment <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g,modem)operational? ❑ ❑ <br /> For any answer of"N"above,describe In section IX how-and when these deficiencies were or will be corrected. - <br /> IX. COMMENTS <br /> J:E ,Lpe_zFO ?Z.b CJri 9 /• C/4c,7-�t¢,nru)> A-1, r;r5rtp <br /> X. IN-TANK GAUGING TESTING <br /> Check this box if tank gauging is used only for Inventory control.(Do not complete this section.) <br /> ❑ Check lhls box If NO tank gauging equipment is installed.(Do not complete this section.) Y N NA <br /> This sectlon most be corn feted!f ln•tank au in is used fo eriorm leak detecflon monitorin . <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination,including lesting for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-lank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely,functlonally tested, ❑ ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled property? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of"N"above describe/a section X1 how and when these deficiencies were or will he corrected. <br /> XI, COMMENTS <br /> Y=Yes.N=No.NA=Not Anollcable <br />