Laserfiche WebLink
Jun, 2b. 2020 3:39PM Donlee Pump Co No. 4053 P. b <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XII. LINE LEAK DETECTOR TESTING <br /> Li Check this box If line leak detectors(LLD)are NOT installed.(Do not complete this secilon,) Y N NA <br /> Thfs section must be completed If LLDs are installed. <br /> Was a leak simulated to verify LLD performance? ,,f 171 ❑ <br /> Check all that apply,) Simulated leak rate verified: 03 GPH El 0.1 GPH ❑0.2 GPH YI <br /> Was the testing apparatus properly calibrated? ❑ ❑ <br /> For emergency generator lank systerns,does the LLD create an audible and visual alarm when a leak Is detected? ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak IS detected? ❑ ❑ <br /> For electronic LLOs,does the turbine automatically shut off when a leak is detected? ❑ Ij <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ U <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or faits a test? ❑ (71 <br /> For electronic LLDs,have all accessible wiring wnnectionS been visually Inspected for kinks and breaks? ❑ ❑ <br /> Were all items on the equipment manufacturers maintenance checklist completed? ❑ ❑ <br /> Were all LLDs conFirrned operational within regulatory requirements? ❑ ❑ <br /> For any answer of"N"above,describe in section Xlll how and when these Issues were or will be corrected. <br /> XIII. COMMENTS <br /> �i,&-b 9) `IEIXTA4Y-.>ti T Lb c4Lrt3e,.re! l,h resTe'p <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> 0—Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This sectlon must be completed If VPH monlior(ng Is used to perform leak detection monitoring. <br /> System Type(Ma(k all that apply.) ❑Vacuum 0 Pressure ❑Hydrostellc <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fall ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑FAII <br /> ❑Pass ❑Fail I]Pass ❑Fail <br /> ❑Pass ❑FAII ❑Pass ❑Fait <br /> v ❑Pass El Fail ❑ ass ❑Fall <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑ Pass ❑Fall ❑Pass ❑Fail <br /> ❑Pass I]Fail ❑Pass ❑Fall <br /> ❑Pass ❑Fail ❑Pass ❑Fall <br /> How was interstitial communication verified? ❑Simulated teak at far ends of the interstitial space. Visual Inspection <br /> ❑Other(Describe the method hr sectfon X11 below.) ❑Gauge <br /> Was the Vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes ❑No(DesCnbe the reason in section XV below.) <br /> For anv answer of"FAIL"above,describe in section XV how and when these Issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons per hour,Y=Yes,N=No,NA�Not applicable,VPH=VacuunvPrmura Nydrostadc,ID o Identification <br />