Laserfiche WebLink
.Jun, 26, 2020 3:39PM Donlee Pump Co No. 4053 P. 7 <br /> j UNDERGROUND STORAGE TANK <br /> 4, MONITORING SYSTEM CERTIFICATION FORM (page s of s) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared_ <br /> If you already have a site plan that shows all required information,you may Include it,rather than this page,with your Monitoring System Cef ricalion <br /> Form. The site plan must show the general layout of tanks and piping and Clearly identify locations of the following equipment,M Installed: 1)monifonng <br /> system control panels;2)in-tank liquld level probes(ff used for leak detection);3)devices moni(odng tank annular spaces or vault;4)devices monitoring <br /> product piping,,5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices monitoring Vapor recovery piping;8)devices monitoring <br /> venMransltion Sumps;9)devices monitoring under-dispenser containment,10)line leak detectors;and 11)devices monitoring any other secondary <br /> containment areas. <br /> s <br /> iO L 8r S5 /Z <br /> VLA <br /> )Taff t- <br /> <rp <br /> - <br /> srp ` NUVLPI� <br /> LEGEND <br />