Laserfiche WebLink
• • <br /> Tasks Completed Building 119 <br /> • Spill Control Equipment and Decontamination Equipment are now provided. <br /> • All Hazardous Waste containers are labeled. <br /> • Hazardous Waste Drums are now covered. <br /> • The facility Contingency Plan has been updated. <br /> • Facility Supervisor has received Hazardous Waste Training. <br /> • Replaced valve on Waste Water Storage Tank. Cleaned up sludge and <br /> surrounding area. <br /> • All production employees have undergone Hazard Communication and <br /> Hazardous Waste training. <br /> • We are currently in the process of purchasing plastic lids for open waste water <br /> storage tanks. <br /> • Building 119 does have an active EPA ID#. CAR000145268 <br />