My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Bravo Installation Manual for the New Advanced Leak Detection <br /> Procedure for Hydrostatic monitoring"(see Exhibit 1). <br /> • The brine level will be monitored monthly for three months to verify that <br /> the brine level remains constant <br /> • The contractor will forward the brine level documentation to Chevron <br /> Maintenance and Chevron HES. <br /> ■ If the brine level in a sump is below the reservoir demarcation line <br /> then: <br /> o Inspection and Documentation(see Step I.A above) actions <br /> will be performed <br /> o If visible leaks are observed,then: <br /> • Brine reservoirs,tubing,tubing fittings,and clamps <br /> shall be replaced as necessary. <br /> • Sump test ports and sump walls shall be repaired by <br /> a tank/sump manufacturer certified contractor only. <br /> • If previously repaired and filled entry boots are <br /> leaking the repair scenario will be escalated to <br /> System Upgrade Actions(see Step III below) <br /> B. Non-Visible Leaks (see Table 2) <br /> If non-visible leaks are detected by the test methods employed in Step I above, all <br /> penetration boots in that sump will be repaired and filled per the B1ueLine Technologies <br /> boot repair method,"KFD Repair Kit Installation Instructions(for continuously <br /> monitored sumps)"(see Exhibit 2). <br /> After the repair(s)is(are) completed,the Bravo Systems Inc. "Installation Manual <br /> for the New Advanced Leak Detection Procedure for Hydrostatic Monitoring"(see <br /> Exhibit 1)will be performed to verify system tightness. If the repair(s)is(are)verified <br /> tight,then: <br /> • Brine will be reintroduced into the sump interstitial space according to the <br /> method described in part B"Mandatory Hydrostatic Fill Instructions"of <br /> the Bravo Installation Manual for the New Advanced Leak Detection <br /> Procedure for Hydrostatic monitoring" (see Exhibit 1). <br /> • The brine level will be monitored monthly for three months to verify that <br /> the brine level remains constant <br /> • The contractor will forward the brine level documentation to Chevron <br /> Maintenance and Chevron HES. <br /> ■ If the brine level in a sump is below the reservoir demarcation line <br /> then: <br /> o Inspection and Documentation(see Step I.A above)actions <br /> will be performed <br /> o If visible leaks are observed,then: <br /> • Visible Leaks actions(see Step II.A above)will be <br /> performed <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.