Laserfiche WebLink
The contractor will complete a Sump Inspection Testing Log for each sump <br /> inspected each time a sump is inspected(see Exhibit 3). <br /> B. Sump Integrity Test <br /> A sump integrity test will be performed on all sumps to verify the sump and sump <br /> component tightness. The test employed will be conducted according to the Bravo <br /> Systems Inc."Installation Manual for the New Advanced Leak Detection Procedure for <br /> Hydrostatic Monitoring"(see Exhibit 1). <br /> If the integrity test reveals that a sump or sump component(s)is(are)tight,the <br /> brine levels will be restored to the demarcation level in the reservoir and the level will be <br /> monitored monthly for three months to verify that the brine level remains constant. <br /> If the brine level shows a diminishing level during the three month monitoring <br /> period then a sump integrity test will be performed to verify the sump and sump <br /> component tightness. The test employed will be conducted according to the Bravo <br /> Systems Inc."Installation Manual for the New Advanced Leak Detection Procedure for <br /> Hydrostatic Monitoring"(see Exhibit 1). <br /> If the integrity test reveals that a sump or sump component(s)is(are)not tight <br /> and there is(are)no visible evidence of the sump or sump component's failure,repairs <br /> will be performed according to Leak Repairs(see Step II below) <br /> I. Leak Repairs <br /> A. Visible Leaks <br /> If visible leaks are detected by the test methods employed in Step I above, all <br /> leaking component(s) shall be repaired. <br /> • Leaking brine reservoirs,tubing,tubing fittings and clamps shall be <br /> replaced as necessary. <br /> • Leaking sump test ports and sump walls shall be repaired by a tank/sump <br /> manufacturer certified contractor only. <br /> w If entry boot(s)is(are)leaking,all entry boots in the specific sump shall <br /> be replaced and filled according to BlueLine Technologies KFD Repair <br /> Kit Installation Instructions(for continuously monitored sumps)(see <br /> Exhibit 2) <br /> After the repair(s)is(are)completed,the Bravo Systems Inc."Installation Manual <br /> for the New Advanced Leak Detection Procedure for Hydrostatic Monitoring"(see <br /> Exhibit 1)will be performed to verify system tightness. If the repair(s)is(are)verified <br /> tight,then: <br /> • Brine will be reintroduced into the sump interstitial space according to the <br /> method described in part B"Mandatory Hydrostatic Fill Instructions"of <br /> 2 <br />