My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The contractor will complete a Sump Inspection Testing Log for each sump <br /> inspected each time a sump is inspected(see Exhibit 3). <br /> B. Sump Integrity Test <br /> A sump integrity test will be performed on all sumps to verify the sump and sump <br /> component tightness. The test employed will be conducted according to the Bravo <br /> Systems Inc."Installation Manual for the New Advanced Leak Detection Procedure for <br /> Hydrostatic Monitoring"(see Exhibit 1). <br /> If the integrity test reveals that a sump or sump component(s)is(are)tight,the <br /> brine levels will be restored to the demarcation level in the reservoir and the level will be <br /> monitored monthly for three months to verify that the brine level remains constant. <br /> If the brine level shows a diminishing level during the three month monitoring <br /> period then a sump integrity test will be performed to verify the sump and sump <br /> component tightness. The test employed will be conducted according to the Bravo <br /> Systems Inc."Installation Manual for the New Advanced Leak Detection Procedure for <br /> Hydrostatic Monitoring"(see Exhibit 1). <br /> If the integrity test reveals that a sump or sump component(s)is(are)not tight <br /> and there is(are)no visible evidence of the sump or sump component's failure,repairs <br /> will be performed according to Leak Repairs(see Step II below) <br /> I. Leak Repairs <br /> A. Visible Leaks <br /> If visible leaks are detected by the test methods employed in Step I above, all <br /> leaking component(s) shall be repaired. <br /> • Leaking brine reservoirs,tubing,tubing fittings and clamps shall be <br /> replaced as necessary. <br /> • Leaking sump test ports and sump walls shall be repaired by a tank/sump <br /> manufacturer certified contractor only. <br /> w If entry boot(s)is(are)leaking,all entry boots in the specific sump shall <br /> be replaced and filled according to BlueLine Technologies KFD Repair <br /> Kit Installation Instructions(for continuously monitored sumps)(see <br /> Exhibit 2) <br /> After the repair(s)is(are)completed,the Bravo Systems Inc."Installation Manual <br /> for the New Advanced Leak Detection Procedure for Hydrostatic Monitoring"(see <br /> Exhibit 1)will be performed to verify system tightness. If the repair(s)is(are)verified <br /> tight,then: <br /> • Brine will be reintroduced into the sump interstitial space according to the <br /> method described in part B"Mandatory Hydrostatic Fill Instructions"of <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.