Laserfiche WebLink
FOLLOW THE CORRECT ORDER: _ -- <br /> A) FIELD AIR INTEGRITY TEST <br /> B) MANDATORY HYDROSTATIC FILLING P I <br /> C) ADVANCED LEAK DETECTION PROCEDURE <br /> D) ATTACHING YOUR MANOMETER <br /> i <br /> A FIELD AIR INTEGRITY TEST <br /> THIS TEST MUST BE COMPLETED 3 <br /> PRIOR TO THE HYDROSTATIC °;" <br /> FILLING OF THE DOUBLEWALL <br /> ''j <br /> PRODUCT. <br /> A.1 - Use test assembly and pressure sump to no more <br /> than 4 PSI. Close off with ball valve and resume other work. Allow 1 Hour before recording pressure. <br /> Field Air Integrity Inspection Test : <br /> BRAVO Hold pressure for a minimum of 1 hour for a Field Integrity Inspection Test. <br /> QUALITY The Tank Sump PASSES the integrity test if the Sump shows NO signs of <br /> STANDARD continuous pressure decay. <br /> A.2 - IF TEST PASSES - CONTINUE ON TO THE HYDROSTATIC FILL & ALD PROCEDURE, <br /> outlined in STEP B. <br /> 11h 0 IS. Bravo Systems Highly Recommends <br /> M <br /> an Extended pressure test. <br /> Ensure that the penetration fittings that are being used <br /> with the Vacuum Monitored System can withstand the <br /> amount of Vacuum your Monitoring System will generate. <br /> 3 ii-ALDP-D-AB-2007 <br />