My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B Mandatory Hydrostatic Fill Instructions <br /> FIELD AIR INTEGRITY INSPECTION TEST : IMPORTANf <br /> YOUR PRODUCT WARRANTY WILL BE VOID IF YOU DID NOT Hold pres- <br /> sure for a minimum of 1 hour for a Field Integrity Inspection Test. After <br /> passing the pressure test, the product should immediately be filled with <br /> interstitial monitoring fluid per the following Vacuum/Hydrostatic fill <br /> method, and then the Advanced Leak Detection Procedure. <br /> YOUR PRODUCT WARRANTY WILL BE REVOKED IF YOU <br /> CHOOSE TO SKIP THE AIR INTEGRITY TEST OUTLINED IN YOUR <br /> COPY OF YOUR PRODUCT INSTALLATION INSTRUCTIONS. YOU MUST COMPLETE THE <br /> PRESSURE TEST PRIOR TO HYDROSTATIC FILLING AND HLD PROCEDURE OF THE SUMPS. <br /> The Bravo Double Wall product's ship from the factory with a combination gauge factory-installed <br /> and held under 20" of mercury, or vacuum. <br /> B.1 -After passing the Field Air Integrity Test per the Installation Instructions and there are no <br /> signs of leaks, you must cut the permanently affixed pipe plug from the tubing connected to the side <br /> wall. This is NOT the tubing with the gauge connected to it. <br /> B.2 - Connect (newly cut) open end of tubing to barb-and-ball-valve assembly. (sola seperately) <br /> A 36" length of clear tubing is factory installed to the barb-and-ball-valve assembly. <br /> After the penetration fittings have <br /> been installed, the <br /> vacuum has been lost. <br /> Cut Plug end off Pressure/soap tests should have <br /> from tubing been conducted. <br /> Barb & <br /> Ball Valve You must cut off the <br /> Assembly barbed plug and <br /> connect the <br /> provided Barb & <br /> Ball Valve <br /> Assembly. Close off <br /> —on-nect- the ball valve and <br /> Assembly _ prepare the Venturi <br /> to tubing Vacuum Generator <br /> and air supply to be <br /> used to fill Sump <br /> with liquid. <br /> 4 ii-ALDP-D-AB-2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.