Laserfiche WebLink
B.3 - Close off ball valve completely and <br /> prime the open ended 36" length of clear tubing <br /> with provided Interstitial Fluid. Use a liquid funnel. <br /> W A <br /> Filling Bravo Systems Double Wall Products .. <br /> with Brine (saline) solution will void the product warranty. <br /> You must use only Bravo-Supplied Interstitial Fluid. <br /> B.4 -After filling the tubing all the way to the ball valve, insert open end into your liquid <br /> source. (5 gallon bucket filled with fluid is recommended.) <br /> Test Port AIR <br /> G"e <br /> n <br /> { <br /> Venturi Vacuum r <br /> Generator <br /> Test Port <br /> Liquid Source: <br /> Bucket filled with AFTER PARTIAL LIQUID _ <br /> Interstitial Fluid. FILL, CLOSE THE BALL <br /> VALVE <br /> B.5 - When ready, pull vacuum using the Venturi Vacuum Assembly(sold seperately) to 20 Inches <br /> of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to slowly flow freely into the <br /> system at a rate of about 2 gallons a minute. <br /> E3. *L-JjQW ...SLOWLY open ball valve... <br /> DO NOT pinch or kink the clear tubing during the fill process. <br /> B.6 - STOP PULLING VACUUM WHEN THE LIQUID IS 2-3 INCHES FROM THE VERY TOP OF <br /> THE INTERSTITIAL SPACE /TEST PORT. This is easily visible while filling the DoubleWall product. <br /> B.7 -After hydrostatic filling, close the ball valve and prepare your Venturi Assembly and <br /> DoubleWall products for a MINIMUM sustained 5 minute vacuum test. <br /> 5 ii-ALDP-D-AB-2007 <br />