My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B.3 - Close off ball valve completely and <br /> prime the open ended 36" length of clear tubing <br /> with provided Interstitial Fluid. Use a liquid funnel. <br /> W A <br /> Filling Bravo Systems Double Wall Products .. <br /> with Brine (saline) solution will void the product warranty. <br /> You must use only Bravo-Supplied Interstitial Fluid. <br /> B.4 -After filling the tubing all the way to the ball valve, insert open end into your liquid <br /> source. (5 gallon bucket filled with fluid is recommended.) <br /> Test Port AIR <br /> G"e <br /> n <br /> { <br /> Venturi Vacuum r <br /> Generator <br /> Test Port <br /> Liquid Source: <br /> Bucket filled with AFTER PARTIAL LIQUID _ <br /> Interstitial Fluid. FILL, CLOSE THE BALL <br /> VALVE <br /> B.5 - When ready, pull vacuum using the Venturi Vacuum Assembly(sold seperately) to 20 Inches <br /> of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to slowly flow freely into the <br /> system at a rate of about 2 gallons a minute. <br /> E3. *L-JjQW ...SLOWLY open ball valve... <br /> DO NOT pinch or kink the clear tubing during the fill process. <br /> B.6 - STOP PULLING VACUUM WHEN THE LIQUID IS 2-3 INCHES FROM THE VERY TOP OF <br /> THE INTERSTITIAL SPACE /TEST PORT. This is easily visible while filling the DoubleWall product. <br /> B.7 -After hydrostatic filling, close the ball valve and prepare your Venturi Assembly and <br /> DoubleWall products for a MINIMUM sustained 5 minute vacuum test. <br /> 5 ii-ALDP-D-AB-2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.